VINYL-FACED CEILINGS Sample Clauses

VINYL-FACED CEILINGS. Lab Areas: Ceilings shall be 2” x 4” x 1⁄2” Certainteed Saint-Gobain, Vinylrock (#1140 CRF-1), Color: White. Vinyl-faced panels shall be Clean Room 5 compatible; high density, ceramic and mineral base panels with scrubbable finish, resistant to heat, moisture, and corrosive fumes, and sag and mold resistant; with a CAC= 40 and a LR=0.78. Suspension system: Certainteed Saint-Gobain 15/16” trim edge (square); Color: White
AutoNDA by SimpleDocs
VINYL-FACED CEILINGS. 843078.08/SD374622-00033/8-4-16/MLT/dek SCHEDULE 0-0- XXXXXXX XXX - XXX XXXXX XXXXX[Xxxxxxxx, Inc.] Ceilings will be 2" x 4" x ½" Certainteed Saint-Gobain, Vinylrock (#1140 CRF-1), Color: White. Vinyl-faced panels shall be Type XX; high density, ceramic and mineral base panels with scrubbable finish, resistant to heat, moisture, and corrosive fumes. Suspension system: Certainteed Xxxxx-Xxxxxx 00/00" trim edge (square); Color: White

Related to VINYL-FACED CEILINGS

  • Ceilings The obligation of Sellers to indemnify the Buyer Indemnitees pursuant to (A) Sections 9.02(a)(i) (other than with respect to any breach of the Fundamental Representations, a failure to perform any Post-Closing Covenant or the special warranty contained in Section 3.01(c)) shall not exceed, in the aggregate fifteen percent (15%) of the unadjusted Purchase Price, and (B) Section 9.02(a)(viii) shall not, with respect to any Property affected by the failure to obtain the applicable Third Party Consent, exceed the Allocated Value of such Property.

  • Ceiling 8.5.1 Single Tenanted Floors

  • Partitions (a) Partitions within the Premises shall have 2” gypsum board on each sided of 3-5/8” metal studs, 16’ on center, taped and spackled. Partitions between the Premises, corridor(s) and between the Premises and adjacent space, shall have 5/8” fire code gypsum board, taped and spackled, on each side of 3-5/8” metal studs, 16” on center above finished ceiling to underside of metal deck. Demising partitions and corridor partitions to have thermofibre insulation installed within, and to be constructed from floor to underside of metal deck above.

  • Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.

  • FLOORING Grade and quality of carpeting to be selected by Landlord, with color to be selected by Tenant from those offered by Landlord.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Walls Sheetrock (drywall) damage should be patched and fire-taped so that there are no holes in either office or warehouse.

  • Restrooms The restrooms, toilets, urinals, vanities and the other apparatus shall not be used for any purpose other than that for which they were constructed, and no foreign substance of any kind whatsoever shall be thrown therein. The expense of any breakage, stoppage or damage resulting from the violation of this rule shall be borne by the Tenant whom, or whose employees or invitees, shall have caused it.

  • Asbestos Mortgagor shall not install nor permit to be installed in the Mortgaged Property asbestos or any asbestos-containing material (collectively, "ACM") except in compliance with any and all applicable present and future Environmental Laws respecting ACM. With respect to any ACM (including friable or non-friable asbestos or asbestos-containing materials regulated under any Environmental Law) discovered to be present in the Mortgaged Property at any time during the operation of this Mortgage, Mortgagor shall comply in all material respects with any and all applicable present and future Environmental Laws, all at Mortgagor's sole cost and expense Upon the occurrence and during the continuation of an Event of Default, Mortgagee may, but shall not be obligated to, in addition to any other remedies set forth herein, take, in substantial compliance with any applicable present and future Environmental Laws, whatever steps it deems reasonably necessary or appropriate to comply with any and all applicable present and future Environmental Laws. Any costs or expenses reasonably incurred by Mortgagee for such purpose shall be due within ten (10) days after demand and payable by Mortgagor and shall bear interest at the Default Rate. Mortgagor shall provide to Mortgagee and its agents and employees reasonable access to the Mortgaged Property and hereby specifically grants to Mortgagee a license to remove or encapsulate such ACM in substantial compliance with any applicable present and future Environmental Law if Mortgagor fails to do so and removal or encapsulation is required under any applicable present and future Environmental Law; provided, however, that nothing contained herein shall obligate Mortgagee to exercise any rights under such license. Mortgagor shall indemnify and hold Mortgagee harmless from and against all loss, cost, damage and expense (including, without limitation, reasonable attorneys' and consultants' fees) that Mortgagee may sustain as a result of the presence of any ACM and any removal or encapsulation thereof or compliance with any and all applicable present and future Environmental Laws other than such loss, cost, damage or expense, if any, to the extent it is caused solely by the gross negligence or willful misconduct of Mortgagee or its agents, contractors and subcontractors in performing any act or exercising its remedies under this Mortgage.

  • ASBESTOS CONTAINING BUILDING MATERIALS Please be advised that an asbestos survey may have been performed at the Property. If provided, please review the information that identifies the locations of known asbestos containing material or presumed asbestos containing material. All personnel and appropriate subcontractors should be notified of the presence of these materials, and informed not to disturb these materials. Any activity that involves the disturbance or removal of these materials must be done by an appropriately trained individual/contractor.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!