Voltage drop Sample Clauses

Voltage drop. 7.1.5.1 Contractor shall be responsible for calculating system voltage drop levels. The maximum system transient impedance or minimum available transient short-circuit capacity, shall be used in making voltage drop calculations relating to motor starting, restarting and/or re-acceleration requirements. 7.1.5.2 The voltage drops which apply to the normal operation of the electrical systems shall be limited to a maximum of the values specified below, unless specific or special apparatus requires improved voltage regulation. The effect on secondary circuit voltages from transformer taps shall be disregarded for normal voltage drop calculations. The voltage drops shall be calculated on the basis of motor and apparatus rating and shall be distributed generally in accordance with the following:
Voltage drop. After the electrification of villages under these projects, pumps for raising water from xxxxx and for supplying water to the houses were installed in the villages. However, in the field survey we found that both pumps had broken down and were inoperative. These pumps had already broken down and been repaired before. The apparent cause of the breakdowns in each case was motor burnout due to reduced voltage. The electricity supply situation there was that the water raising and supply pumps were situated 400m away from the distribution transformer, and most of the villagers' houses were connected to the low-voltage distribution line in that interval. In the records of the Udon Thani substation referred to earlier, the demand peak occurs at dinner time, between 6pm and 8pm. In this period, when demand is concentrated, the decline in voltage is greatest at the ends of distribution feeders. The motors also run automatically at such times, and this leads to the pump motors burning out, due to the principle explained below. Incidentally, there is a law prohibiting the use of agricultural pumps at night, so they are not used in the same peak period. The reason voltage drop causes motor burnout is that, due to the properties of motors, a 10%
Voltage drop. The voltage difference between the sending and receiving ends must not exceed 5% of the nominal capacity. In Scheme No. 1, at the end of this Annex, the general configuration of the project is described.

Related to Voltage drop

  • Workstation/Laptop encryption All workstations and laptops that process and/or store DHCS PHI or PI must be encrypted using a FIPS 140-2 certified algorithm which is 128bit or higher, such as Advanced Encryption Standard (AES). The encryption solution must be full disk unless approved by the DHCS Information Security Office.

  • Switching All of the negotiated rates, terms and conditions set forth in this Section pertain to the provision of local and tandem switching.

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Network Access Control The VISION Web Site and the Distribution Support Services Web Site (the “DST Web Sites”) are protected through multiple levels of network controls. The first defense is a border router which exists at the boundary between the DST Web Sites and the Internet Service Provider. The border router provides basic protections including anti-spoofing controls. Next is a highly available pair of stateful firewalls that allow only HTTPS traffic destined to the DST Web Sites. The third network control is a highly available pair of load balancers that terminate the HTTPS connections and then forward the traffic on to one of several available web servers. In addition, a second highly available pair of stateful firewalls enforce network controls between the web servers and any back-end application servers. No Internet traffic is allowed directly to the back-end application servers. The DST Web Sites equipment is located and administered at DST’s Winchester data center. Changes to the systems residing on this computer are submitted through the DST change control process. All services and functions within the DST Web Sites are deactivated with the exception of services and functions which support the transfer of files. All ports on the DST Web Sites are disabled, except those ports required to transfer files. All “listeners,” other than listeners required for inbound connections from the load balancers, are deactivated. Directory structures are “hidden” from the user. Services which provide directory information are also deactivated.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.

  • Video Display Terminals ‌ The Employer shall ensure that any new office equipment or facility required for use in conjunction with VDTs shall meet the standards recommended by the Workers' Compensation Board.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!