Water Distribution Sample Clauses

Water Distribution o Distribution on CT is primarily via underground piping with regulated gravity feed from the main tank to the point of connection and metering at the facilities that are at a lower elevation than the tank. For the CT facilities on the main telescope platform, above the water tank, the potable water is pumped into a hydropneumatic secondary tank that provides adequate pressure for distribution to the point of connection and metering at the facilities above. o Potable water is delivered to CP by the Service Provider in a tanker truck to a 200 cubic meter tank in the common CP service yard. From the point of connection and metering near the main CP water tank all pumping, distribution, secondary storage and any further treatment for use by the client facilities is the responsibility of the Clients. o Potable water distribution on CT and CP also serves for fire control, with fire hydrants installed in the main line adjacent to major facilities and a pumper truck stationed on CT.
AutoNDA by SimpleDocs
Water Distribution. 1. The Developer shall furnish, construct and install water mains in the Development. The location of the water mains shall be approved by the Director prior to commencement of work. 2. The Developer shall install water laterals to serve each lot in the Plat. All laterals shall be installed to the lot line. Only the portion of the water lateral located between the water main and the curb stop shall be dedicated to the City. The remaining portion of the lateral shall remain under the ownership and control of the Developer or owner of lot or its successor or assign. 3. All water main and service lateral construction shall be completed prior to the start of street construction.
Water Distribution. The Developer shall furnish, construct and install water mains and laterals in accordance with plans and specifications prepared by Developer in accordance with Village standards and approved by the Village Engineer. No installation of water mains and laterals shall commence until plans and specifications have been approved by the Village Engineer and the Wisconsin Department of Natural Resources as it requires.
Water Distribution. The Navajo Nation looked to the investigations 10 performed by the IHS to identify deficiencies in the Reservation water distribution system.
Water Distribution. The Stewards shall be recognized Union representatives for the purpose of investigating and processing grievances through the intra-divisional levels of the grievance procedure in their respective jurisdictional area. Stewards shall be permitted reasonable time during working hours without loss of pay to investigate and process grievances relating to employees in the jurisdictional area to which the Xxxxxxx is assigned. If the presence of a Xxxxxxx is requested at a grievance meeting, the appropriate Xxxxxxx will be permitted to attend. A Union Xxxxxxx shall obtain permission from his supervisor before leaving the job to conduct Union business. In the case of an approved leave of the Xxxxxxx, the Union President or Vice President may process grievances. In no case shall a vacancy exist for more than 30 days; in the case where a vacancy exists for more than 30 days, the Union shall appoint an Acting Xxxxxxx from the respective area noted in Article 6, Section 2.
Water Distribution. The contractor shall provide two working days notice to Milwaukee Water Works Distribution when requesting a shut-off, wet connection, safe water sample, pressure testing, and chlorination. Contact Xxx Xxxxxxxx, Water Construction Manager, 000-000-0000
Water Distribution. A.3.2.1 OMI shall operate, maintain, and repair the CITY’s water transmission and distribution systems. Such maintenance shall include water service lines to the curb stop. OMI shall diligently respond to all service calls for water leaks, breaks, or emergencies regarding water production and distribution, and in no event later than one (1) hour after being notified of such incidents. OMI shall provide properly certified employees as required by federal, state, and local laws to provide leadership of crews for proper decision making in performing their tasks. OMI services in this function shall specifically include, but not be limited to the activities described below. XXX will work collaboratively with the CITY to develop a customer interface to better inform the customer regarding construction and repair activity status. A.3.2.2 OMI will directionally flush twenty-five percent (25%) of water system lines annually. OMI shall track the water volume used to conduct this service as part of the annual water use accounting. The entire water distribution system shall be directionally flushed within four years. A.3.2.3 All distribution control valves will be operated at a minimum once per year with the date of operation recorded for future reference. Each valve will be verified to be left in proper operating position and in working condition. As part of this annual "operation", each valve box top shall be painted and an arrow painted on the road (per standard procedures) to indicate valve location and a geographic positioning system (GPS) reading will be taken. The GPS location data shall be turned in to the CITY monthly. If the valve box is not properly aligned over the valve, the box will be excavated and the box properly reset, using site-mixed concrete to construct a new collar around the box. On paved roads, valve boxes sitting too low will be raised and a new concrete collar poured flush with the surface of the paving. A.3.2.4 Assess plans for the current, as-built, water distribution system and identify alternative corrective measures for water storage and distribution system deficiencies. A.3.2.5 Document the conditions and evaluate redundancies in the water system storage and pumping facilities. A.3.2.6 Perform Emergency and other water line repairs. XXX’s workforce will repair all water line breaks, in a timely manner and with minimum disruption of the neighborhood and traffic flow. OMI shall complete ninety percent (90%) of all water line repairs with...
AutoNDA by SimpleDocs
Water Distribution. Installation of pipes and carrying out of the associated works to improve water supply and distribution within the UEs.
Water Distribution i. The Developer shall connect to a Village water main to serve the Project. ii. All water main and lateral construction shall be completed prior to the application of aggregate base and the first course of asphalt street pavement. iii. No installation of water service shall commence until Plans and Specifications have been approved by the Village Engineer and the Wisconsin Department of Natural Resources as it requires.
Water Distribution. A water distribution system capable of carrying water at adequate volume and pressure to each of its customers.