Water Systems. 2.6.2.1. Verify systems have been flushed clean, strainers and filters are in place and clean, and that the system has been refilled and vented. 2.6.2.2. Verify that Contractor has installed all temperature and pressure test plugs as required to obtain a thorough flow test. 2.6.2.3. Balance all water flows using pump curve data. Balance all chilled water coils, hot water coils, heat exchangers, cooling towers, boilers, and chillers to specified flow rates. 2.6.2.4. Provide air and water entering and leaving conditions on all equipment. 2.6.2.5. Record pump flow rates, pressures, running amperage, and full load amperage at design flow and shut off conditions.