Watershed Data Summary. The following table summarizes the watershed data used to determine peak flows and runoff volumes required to design wet detention basin #1. Summary Data Elements Subwatershed A Subwatershed B (off-site) Pre-develop Post-develop Pre-develop Post-develop Watershed Areas (in acres) (see attached map) 41 acres 41 acres 26 26 Average Watershed Slopes (%) 2-8% 2-8% 3-6% 3-6% Land Uses (% of each) (see attached map) 75 ac. cropland 15 ac. brush 10 ac. woodland 110 ac. ½ ac. lots 5ac. brush 5 ac. woodlands 50% cropland 50% 1 acre lots 50% cropland 50% 1 acre lots Runoff Curve Numbers 68 x 75ac.= 5100 30 x 25ac.= 750 Net 5850\100 ac. RCN = 59 70 x 110 ac.= 7700 10 x 10 ac.= 100 Net 7800\120ac RCN = 65 RCN = 68 (state standard) RCN = 70 Conveyance Systems Types Grass waterway 50% grass swale 50% storm sewer 100% bare channel 100% grass swale Summary of Average Conveyance System Data 8’ bottom/4:1 ss 2’ depth/3% grade 2’ depth swale/3% 30” r/c sewer/2% (see calcs.) 15’ (w) top 1’ (d) parabolic 2% grade 2’ deep standard road ditch 2% grade Time of Concentration (Tc) (see attached map & worksheets) 1.1 hrs. .97 hrs. .74 hrs. .65 hrs. 25% of 2-yr 24-hr post-dev runoff volume N/A 2.29 ac. ft. N/A .19 ac. ft. 1-year/24 hour Runoff Volume N/A (.2” x 60 ac.) 1.0 ac. ft. N/A (.34” x 10 ac.) .28 ac. ft. 2-yr./24 hour Peak Flow (see attached hydrographs) 11.2 cfs 14.3 cfs 5.1 cfs 3.2 cfs 10-yr./24 hour Peak Flow 21 cfs 32 cfs 18.4 cfs 11.3 cfs 100-yr./24 hour Peak Flow 78 cfs 91 cfs 53 cfs 21 cfs Exhibit D (continued)
Appears in 4 contracts
Samples: Management Practice Maintenance Agreement, www.oconomowoc-wi.gov, www.waukeshacounty.gov
Watershed Data Summary. The following table summarizes the watershed data used to determine peak flows and runoff volumes required to design wet detention basin #1. Summary Data Elements Subwatershed A Subwatershed B (off-site) Pre-develop Post-develop Pre-develop Post-develop Watershed Areas (in acres) (see attached map) 41 acres 41 acres 26 26 Average Watershed Slopes (%) 2-8% 2-8% 3-6% 3-6% Land Uses (% of each) (see attached map) 75 ac. cropland 15 ac. brush 10 ac. woodland 110 ac. ½ ac. lots 5ac. brush 5 ac. woodlands 50% cropland 50% 1 acre lots 50% cropland 50% 1 acre lots Runoff Curve Numbers 68 x 75ac.= 5100 30 x 25ac.= 750 Net 5850\100 ac. RCN = 59 70 x 110 ac.= 7700 10 x 10 ac.= 100 Net 7800\120ac RCN = 65 RCN = 68 (state standard) RCN = 70 Conveyance Systems Types Grass waterway 50% grass swale 50% storm sewer 100% bare channel 100% grass swale Summary of Average Conveyance System Data 8’ bottom/4:1 ss 2’ depth/3% grade 2’ depth swale/3% 30” r/c sewer/2% (see calcs.) 15’ (w) top 1’ (d) parabolic 2% grade 2’ deep standard road ditch 2% grade Time of Concentration (Tc) (see attached map & worksheets) 1.1 hrs. .97 hrs. .74 hrs. .65 hrs. 25% of 2-yr 24-hr post-dev runoff volume N/A 2.29 ac. ft. N/A .19 ac. ft. 1-year/24 hour Runoff Volume N/A (.2” x 60 ac.) 1.0 acyr. ft. N/A (.34” x 10 ac.) .28 ac. ft. 2-yr./24 /24 hour Peak Flow (see attached hydrographs) 2.3 cfs 5.1 cfs 1.9 cfs 2.9 cfs 2-yr./24 hour Peak Flow 11.2 cfs 14.3 cfs 5.1 cfs 3.2 cfs 10-yr./24 hour Peak Flow 21 cfs 32 cfs 18.4 cfs 11.3 cfs 100-yr./24 hour Peak Flow 78 cfs 91 cfs 53 cfs 21 cfs Exhibit D (continued)
Appears in 1 contract
Samples: www.waukeshacounty.gov