Wetlands Setbacks Sample Clauses

Wetlands Setbacks. Wetlands setbacks shall be as required by the St. Xxxxx River Water Management District.
AutoNDA by SimpleDocs

Related to Wetlands Setbacks

  • Setbacks Developer shall maintain the setbacks for the Project as shown on the Project Plans. In the event that any inconsistencies exist between the Zoning Ordinance and the setbacks established by this Agreement, then the setbacks required by this Agreement shall prevail.

  • Wetlands When disposing of excess, soil, or other construction materials on public or private property, Contractor shall not fill in or otherwise convert wetlands.

  • Wetlands Protection Xxxxxxxx requiring protection under Executive Order 11990 are shown on Sale Area Map. Vehicular or skidding equipment shall not be used in such wetlands, except where roads, landings, and tractor roads are approved under B5.1 or B6.422. Additional measures needed to protect such areas are provided in C6.62.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • FLOODPLAIN MANAGEMENT AND WETLAND PROTECTION Executive Order 11988, Floodplain Management, May 24, 1977 (42 FR 26951), 3 C.F.R., 1977 Comp., p. 117, as interpreted in HUD regulations at 24 C.F.R. Part 55, particularly Section 2(a) of the Order (For an explanation of the relationship between the decision- making process in 24 C.F.R. Part 55 and this part, see § 55.10.); and Executive Order 11990, Protection of Wetlands, May 24, 1977 (42 FR 26961), 3 C.F.R., 1977 Comp., p. 121 particularly Sections 2 and 5. COASTAL ZONE MANAGEMENT The Coastal Zone Management Act of 1972 (16 U.S.C. § 1451, et seq.), as amended, particularly sections 307(c) and (d) (16 U.S.C. § 1456(c) and (d)).

  • PLUMBING RESTRICTIONS The following unacceptable plumbing practices are prohibited by State regulations.

  • Wildlife Do not feed any of the wildlife ever. Animals of any size are potentially dangerous. Feeding even small animals attracts predators. Supervise children at all times. Keep garage doors closed at all times except when entering or leaving the Rental Home.

  • Environmental Pollution Unless disposition of environmental pollution is specifically a part of this contract, PURCHASER shall immediately notify STATE of any hazardous substance(s) which PURCHASER discovers or encounters during performance of the operation. "Hazardous substance(s)" are those substances, materials, or wastes regulated by state or federal law. PURCHASER shall immediately cease operating in any particular area of the operations where a hazardous substance(s) has been discovered or encountered, if continued operations in such area would present a bona fide risk or danger to the health or well being of PURCHASER's or any subcontractor's work force. Upon being notified by PURCHASER of the presence of hazardous substance(s) on the areas of operations, STATE shall arrange for the proper disposition of such hazardous substance(s).

  • Subsurface Conditions Unless the Contract Documents stipulate specific quantities and units of rock or unsuitable soils, the Contractor shall assume material below the surface of the Earth to be earth and other material that can be removed by power shovel or similar equipment. Should conditions encountered below the surface of the ground be at variance to the number of unit requirements as indicated by drawings or specifications, and absent an agreed-upon unit price established prior to the bid by Addendum, or after contract execution by Change Order, the Contract Sum and/or time shall be adjusted as provided in the Contract Documents for changes in the work.

Time is Money Join Law Insider Premium to draft better contracts faster.