Common use of When filling Slumps and/or Erosion Clause in Contracts

When filling Slumps and/or Erosion. Borrow shall be obtained from agreed locations, placed in layers, and compacted by operating the hauling and spreading equipment uniformly over the full width of each layer. Existing Surface and Base Course Material shall be salvaged when practical and re-laid after depressions have been filled. The repaired areas of the Slump shall conform to the cross-section of the adjacent undisturbed Roadway.

Appears in 4 contracts

Samples: Timber Sale Contract, Timber Sale Contract, Timber Sale Contract

AutoNDA by SimpleDocs

When filling Slumps and/or Erosion. Borrow shall be obtained from agreed locations, placed in layers, and compacted by operating the hauling and spreading equipment uniformly over the full width of each layer. Existing Surface and Base Course Material shall be salvaged when practical and re-laid after depressions have been filled. The repaired areas of the Slump shall conform to the cross-section of the adjacent undisturbed Roadway. 3.3 All disturbed areas will be revegetated in accordance with T-8410 Vegetation Establishment.

Appears in 1 contract

Samples: Timber Sale Contract

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!