Xmtr Power Setup (optional Sample Clauses

Xmtr Power Setup (optional. In the “Xmtr power setup” a set time can be selected from 0 to 9 minutes using the ‘ARROW’ keys. When the correct time is entered press the ‘ENTER’ key (F1) to continue. When selecting a zero, the Xmtr supply will be on continuously. When a time between 1 - 9 minutes is selected the Xmtr supply will be switched off after the set time. However, this is only done when the pressure change limit has not exceeded in the meantime. When the pressure change has exceeded the limit, the timer is reset to zero and starts again. In the next screen a value can be entered from 0.1 to 99.9% FS using the ‘ARROW’ keys. The entered time and the limit will be saved in the internal memory and will be used immediately to switch the Xmtr supply on or off. The transmitter supply increases the current drawn from the batteries, use it only when needed.
AutoNDA by SimpleDocs

Related to Xmtr Power Setup (optional

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the End User’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the End User and the cross-box.

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • Enhanced Optional Daily Usage File (EODUF 13.1 The EODUF service Agreement with terms and conditions is included in this Attachment as Exhibit C. Rates for EODUF are as set forth in Exhibit D.

  • STRS PICK-UP A. The Board shall pick-up contributions to the State Teachers’ Retirement System paid on behalf of the employees in the bargaining unit utilizing the salary reduction method under the following terms and conditions:

  • Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame (MDF) to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (DAMLs), and may have up to 6,000 feet of bridged tap between the End User’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For Loops less than 18,000 feet and with less than 1300 Ohms resistance, the Loop will provide a voice grade transmission channel suitable for Loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point.

  • Coronavirus-Related Distributions (CRDs If you qualify, you may withdraw up to $100,000 in aggregate from your IRAs and eligible retirement plans as a CRD, without paying the 10 percent early distribution penalty tax. You are a qualified individual if you (or your spouse or dependent) is diagnosed with the COVID-19 disease or the SARS-CoV-2 virus in an approved test; or if you have experienced adverse financial consequences as a result of being quarantined, being furloughed or laid off or having work hours reduced due to such virus or disease, being unable to work due to lack of child care due to such virus or disease, closing or reduced hours of a business owned or operated by you due to such virus or disease, or other factors as determined by the IRS. A CRD must be made on or after January 1, 2020, and before December 31, 2020. CRDs will be taxed ratably over a three-year period, unless you elect otherwise, and may be repaid over three years beginning with the day following the day a CRD is made. Repayments may be made to an eligible retirement plan or IRA. An eligible retirement plan is defined as a qualified retirement plan, 403(a) annuity, 403(b) tax-sheltered annuity, 457(b) eligible governmental deferred compensation plan, or an IRA. FINANCIAL DISCLOSURE

  • CLEC Provided Splitter – Line Sharing 3.4.1 Freedom may at its option purchase, install and maintain central office POTS splitters in its collocation arrangements. Freedom may use such splitters for access to its customers and to provide digital line subscriber services to its customers using the High Frequency Spectrum. Existing Collocation rules and procedures and the terms and conditions relating to Collocation set forth in Attachment 4- Central Office shall apply.

  • Unbundled Copper Loops (UCL) 2.4.1 BellSouth shall make available Unbundled Copper Loops (UCLs). The UCL is a copper twisted pair Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters) and is not intended to support any particular telecommunications service. The UCL will be offered in two types – Designed and Non-Designed.

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).

Time is Money Join Law Insider Premium to draft better contracts faster.