XXXX for BTM Sample Clauses

XXXX for BTM. NG Resources Evaluated in a Class Year Deliverability Study If meter data is available for both the Load and the generator, the initial XXXX that can be requested is limited to the demonstrated Net-ICAP. If meter data is not available for either the Load or the generator of the BTM:NG Resource, the initial XXXX that can be requested is limited to the Net-ICAP calculation set forth in Section 5.12.1 of the ISO Services Tariff. The initial XXXX level will set at the XXXX MW level evaluated in the Class Year Deliverability Study and either found to be deliverable or for which the Developer accepted its Project Cost Allocation and posted Security for any required System Deliverability Upgrades. The XXXX level will be set, and reset if necessary, at the maximum DMNC level achieved during successive Summer Capability Periods, not to exceed the initial XXXX level, until the facility has DMNC levels recorded for five Summer Capability Periods – i.e., the initial XXXX level will act as a cap through the set and reset period and for the final XXXX level. The final XXXX level will be the highest Net-ICAP recorded for the Summer Capability Period during the five-year set and reset period, excluding the initial XXXX level. The five-year XXXX set and reset period will terminate early, before five Net-ICAP values have been recorded if any of the following conditions occurs: (i) the BTM:NG Resource ceases to qualify as a BTM:NG Resource pursuant to Section 5.12.1 of the Services Tariff; (ii) the BTM:NG Resource elects to participate as another type of Installed Capacity Supplier, other than as a BTM:NG Resource; or (iii) the BTM:NG Resource’s Net ICAP is equal to or less than zero for a Capability Period. Upon an early termination of the five-year XXXX set and reset period, the final XXXX value will be determined based on the available data from the XXXX set and reset period up to the point of early termination – i.e., the highest Net ICAP value recorded during the XXXX set and reset period prior to the point of early termination.
AutoNDA by SimpleDocs

Related to XXXX for BTM

  • PRICING for Markup of Non-Prepriced Items in RS Means Unit Price Book What is your proposed Markup Percentage on materials not found in the RS Means Price Book? If any materials being utilized for a project cannot be found in the RS Means Price Book, this question is what is the markup percentage on those materials? When answering this question please insert the number that represents your percentage of proposed markup. Example: if you are proposing a 30 percent markup, please insert the number "30". Remember that this is a ceiling markup. You may markup a lesser percentage to the TIPS Member customer when pricing the project, but not a greater percentage. EXAMPLE: You need special materials that are not in the RS Means Unit Price Book for a project. You would buy the materials and mark them up to the TIPS Member customer by the percentage you propose in this question. If the materials cost you, the contractor, $100 and you proposed a markup on this question for the material of 30 percent, then you would charge the TIPS Member customer $130 for the materials.

  • Interested Party for the purpose of filing a dispute relating to a solicitation, as used in this section, means an actual or prospective bidder or offeror whose direct economic interest would be affected by the award of a Contract or by the failure to award a Contract.

  • Usage for Voice Mail Message Service 6.1.2 Rated Incollects (originated in BellSouth and from other companies) can also be on Optional Daily Usage File. Rated Incollects will be intermingled with BellSouth recorded rated and unrated usage. Rated Incollects will not be packed separately.

  • Unbundled Voice Xxxx - XX0 (XXX-XX0). Loops are 2-wire loop start circuits, will be non-designed, and will not have remote access test points. OC will be offered as a chargeable option on XX0 Xxxxx when reuse of existing facilities has been requested by NewPhone, however, OC is always required on UCLs that involve the reuse of facilities that are currently providing service. NewPhone may also order OC-TS when a specified conversion time is requested. OC-TS is a chargeable option for any coordinated order and is billed in addition to the OC charge. An Engineering Information (EI) document can be ordered as a chargeable option. The EI document provides Loop Make-Up information which is similar to the information normally provided in a Design Layout Record (DLR). Upon issuance of a non-coordinated order in the service order system, XX0 Xxxxx will be activated on the due date in the same manner and time frames that BellSouth normally activates POTS-type Loops for its customers.

  • Criteria for Evaluation Criteria for employee performance review shall be made available to the employee before the start of the evaluation period and shall remain unchanged during the evaluation period unless the employee is made aware of the changes.

  • Time Limit for Filing The parties may mutually agree in writing to extend any of the time limits set forth in this Agreement.

  • Planning for Future Years (a) Advance Notice. The Funder will give at least 60 Days’ Notice to the HSP of the date by which a Planning Submission, approved by the HSP’s governing body, must be submitted to the Funder.

  • PROCEDURES FOR EVALUATION A. The evaluations of school year employees covered by this agreement shall be completed no later than May 30 of each school year for 9-month employees and by June 30 for 10/12-month employees. The evaluation shall be reviewed with the employee, with a copy given to the employee at the conclusion of the review. An employee may present written comments, which shall be attached to the written evaluation document. The evaluator and employee shall sign the evaluation document. The employee’s signature does not constitute approval or disapproval, but only that the evaluation has been reviewed with the employee.

  • Unbundled Voice Loop – SL2 (UVL-SL2 Loops may be 2-wire or 4-wire circuits, shall have remote access test points, and will be designed with a DLR provided to NewPhone. SL2 circuits can be provisioned with loop start, ground start or reverse battery signaling. OC is provided as a standard feature on XX0 Xxxxx. The OC feature will allow NewPhone to coordinate the installation of the Loop with the disconnect of an existing customer’s service and/or number portability service. In these cases, BellSouth will perform the order conversion with standard order coordination at its discretion during normal work hours.

  • Unbundled Voice Xxxx XX0 (XXX-XX0) Loops are 2-wire Loop start circuits, will be non-designed, and will not have remote access test points. OC will be offered as a chargeable option on XX0 Xxxxx when reuse of existing facilities has been requested by ONS. ONS may also order OC-TS when a specified conversion time is requested. OC-TS is a chargeable option for any coordinated order and is billed in addition to the OC charge. An Engineering Information (EI) document can be ordered as a chargeable option. The EI document provides Loop Make-Up information which is similar to the information normally provided in a Design Layout Record (DLR). Upon issuance of a non-coordinated order in the service order system, XX0 Xxxxx will be activated on the due date in the same manner and time frames that BellSouth normally activates POTS-type Loops for its End Users.

Time is Money Join Law Insider Premium to draft better contracts faster.