Common use of XXXXXX XXXXXXX XXXXXXXXXXX Clause in Contracts

XXXXXX XXXXXXX XXXXXXXXXXX. The use of metal tracked equipment is not allowed on bridge surface at any time. If Purchaser must run equipment on bridge surface, then rubber tired equipment or other methods, approved in writing by Contract Administrator, must be used. If tracked equipment is used on bridge surfaces, Purchaser shall immediately cease all road construction and hauling operations. Purchaser shall remove any dirt, rock, or other material tracked or spilled on the bridge surface and have surface evaluated by the District Engineer or their designee for any damage caused by transporting equipment. Any damage to the surface will be repaired, at the Purchaser’s expense, as directed by the Contract Administrator.

Appears in 2 contracts

Samples: Non Drivable, Non Drivable

AutoNDA by SimpleDocs

XXXXXX XXXXXXX XXXXXXXXXXX. The use of metal tracked equipment is not allowed on bridge surface surfaces at any time. If Purchaser must run equipment on bridge surfacesurfaces, then rubber tired equipment or other methods, approved in writing by Contract Administrator, must be used. If tracked equipment is used on bridge surfaces, Purchaser shall immediately cease all road construction and hauling operations. Purchaser shall remove any dirt, rock, or other material tracked or spilled on the bridge surface surface(s) and have surface surface(s) evaluated by the District Region Engineer or their designee and/or Registered Professional Structural Engineer as required by Contract Administrator for any damage damages caused by transporting equipment. Any damage to the surface surface(s) will be repaired, at the Purchaser’s expense, as directed by the Contract Administrator.

Appears in 1 contract

Samples: www.dnr.wa.gov

AutoNDA by SimpleDocs

XXXXXX XXXXXXX XXXXXXXXXXX. The use of metal tracked equipment is not allowed on bridge surface surfaces at any time. If Purchaser must run equipment on bridge surfacesurfaces, then rubber tired equipment or other methods, approved in writing by Contract Administrator, must be used. If tracked equipment is used on bridge surfaces, Purchaser shall immediately cease all road construction and hauling operations. Purchaser shall remove any dirt, rock, or other material tracked or spilled on the bridge surface surface(s) and have surface surface(s) evaluated by the District Engineer or their designee for any damage caused by transporting equipment. Any damage to the surface surface(s) will be repaired, at the Purchaser’s expense, as directed by the Contract Administrator.

Appears in 1 contract

Samples: www.dnr.wa.gov

Time is Money Join Law Insider Premium to draft better contracts faster.