TRANSMISSION CONTROL AGREEMENTTransmission Control Agreement • May 20th, 2021
Contract Type FiledMay 20th, 2021During normal operation, each DCPP unit’s electrical loads are supplied from the unit’s main onsite electrical generator. If the generator is not available, either due to unit shutdown or other reason, the loads are transferred to an alternative source. The preferred immediate alternate source of electrical power for DCPP electric loads (safety-related and nonsafety-related) is the offsite power supply or 230kV grid In addition DCPP has a delayed 500 kV source. The offsite power source is sometimes referred to as the preferred power supply in the regulatory documents.
TRANSMISSION CONTROL AGREEMENTTransmission Control Agreement • June 4th, 1998
Contract Type FiledJune 4th, 1998During normal operation, each DCPP unit's electrical loads are supplied from the unit's main onsite electrical generator. If the generator is not available, either due to unit shutdown or other reason, the loads are transferred to an alternative source. The preferred immediate alternate source of electrical power for DCPP electric loads (safety -related and nonsafety-related) is the offsite power supply or 230kV grid In addition DCPP has a delayed 500 kV source. The offsite power source is sometimes referred to as the preferred power supply in the regulatory documents.