Re: Proposed City-Contractor Agreement for Native Plant Maintenance of Stormwater BMP’sCity-Contractor Agreement • March 11th, 2022
Contract Type FiledMarch 11th, 2022Since 2018, the Department of Public Works has contracted to maintain two stormwater management areas located adjacent to Route 109 and Pond-Grover Parkway. Both stormwater management areas feature basins designed to capture storm water, filter any sediment out of the water and release the flow. Area #1 is a bio-retention area which is a dry basin designed to temporarily retain and absorb most rainfall events into the ground. Area #2 is a wet basin, which has a shallow pond.