City-Consultant Agreement Sample Contracts

MEMORANDUM
City-Consultant Agreement • January 5th, 2024

In January 2022, the Wildwood City Council passed resolution 2022-4 approving an application to East West Gateway Council of Governments for the Valley Road improvement Project.

AutoNDA by SimpleDocs
Re: City - Consultant Agreement with Geotechnology, Inc. for Environmental Services on the Strecker Road Sidewalk Project
City - Consultant Agreement • September 23rd, 2020

This will include a geophysical survey to identify potential drums or debris in the shallow subsurface. The geophysical survey will use the ground penetrating radar (GPR) method.

Re: City-Consultant Agreement for Right of Way Acquisition for the Old State Road Shared Use Path Project
City-Consultant Agreement • November 10th, 2023

In 2022, the City contracted with Intuition & Logic to design the Old State Road Shared Use Path Project. This project consists of construction of a new 10-foot-wide shared use path along the north side of Old State Road from Nantucket Island Drive to Old State Place. The project consists mainly of a new path and includes some stormwater drainage work and a crosswalk at Lakeshore Meadows Drive. The total cost of the project is estimated at $1.4M.

Re: City-Consultant Agreement for Design of Route 100 J-Turn Project
City-Consultant Agreement • November 9th, 2023

The City of Wildwood has obtained both federal and state cost share funds to be used to design and construct J-Turns at two intersections: Route 100 & Route T; and Route 100 and Pond Rd. The installation of J-turn improvements will reduce the existing at-grade crossovers at Pond and State Route T. All left turns onto Route 100 from the side roads at these intersections will be required to utilize the new median J-turns. The estimated cost to design and construct this project is $3.010M.

Re: City-Consultant Agreement with White Buffalo
City-Consultant Agreement • June 8th, 2023 • Missouri

Background: White Buffalo Inc. (WB), has provided the attached updated proposal, for 2023-2024, to begin the reduction of the deer population within the City of Wildwood.

Background: Last spring, Davey Resource Group (DRG) began work to complete a full city-wide inventory of street trees, which was estimated to be 6,000 trees. This work, which cost $22,000, was funded under a city-consultant agreement with DRG with the...
City Consultant Agreement • September 4th, 2022

Unfortunately, DRG was unable to complete the city-wide inventory, as the level of effort far exceeded the original estimate of 6,000 trees. To complete the project, DRG is estimating an additional 3,000-6,000 sites will need to be inventoried and has provided second proposal to the Department for this work, which has been attached as Exhibit A. The final cost to the City will be based on the actual number of sites inventoried, but will not exceed $21,900 for 6,000 sites, or $3.65/tree. Please note that 75% of the cost for this work, or

Re: Proposed City-Consultant Agreement for Design of the Route 109 Sidewalk Project
City-Consultant Agreement • June 6th, 2022

Background: For 2022, the Council authorized $150,000 in the capital improvement fund to construct a segment of new sidewalk on Route 109, from Manchester Road to south of Viola Gill Lane. This project will fill a gap in the pedestrian facilities along the east side of Route 109 between Route 100 and Manchester Road. The Department began the process to design this sidewalk segment a few years ago, as plans were completed by the engineering firm HR Green, Inc. Please see Exhibit A for the location of the project. A copy of the prior plans has been included as Exhibit B.

MEMORANDUM
City-Consultant Agreement • October 24th, 2022

To: Administration/Public Works Committee Members From: Rick C. Brown, Director of Public Works/City Engineer Date: October 24, 2022

MEMORANDUM
City-Consultant Agreement • December 4th, 2023

To: Administration/Public Works Committee Members From: Rick C. Brown, Director of Public Works / City Engineer Date: December 4, 2023

Re: City-Consultant Agreement for Final Design of Main Street Extension Project
City-Consultant Agreement • November 9th, 2023 • Missouri

The connection of Main Street between Highway 109 and Taylor Road has been contemplated by the City of Wildwood since the first Master Plan was developed in February of 1996. This Main Street connection has been a central focal point of the Town Center throughout the entirety of Wildwood’s existence. This connection is referenced in many of the plans that have been developed by the City including: