Project: Design-Build Master Agreement for Water ProjectsDesign-Build Master Agreement • September 21st, 2023
Contract Type FiledSeptember 21st, 2023Work Order Packages awarded under this Master Agreement will include, but not be limited to the design, upgrade, construction, alteration, and repair of new and existing water and facilities throughout the City.
RE: Design-Build Master Agreement for Water, Wastewater, and Storm Water Projects Account No. 502-521-3743-7865 and 592-412-I728-7801Design-Build Master Agreement • June 2nd, 2020
Contract Type FiledJune 2nd, 2020FOR INFORMATION ONLY, the Department of Public Works is advertising for qualifications to perform as-needed design, construction, upgrade, alteration, and repair of new and existing water, wastewater, and storm water systems and facilities under a Design-Build Master Agreement.
ADDENDUM TO DESIGN-BUILD MASTER AGREEMENTDesign-Build Master Agreement • March 8th, 2024
Contract Type FiledMarch 8th, 2024THIS ADDENDNUM TO THE DESIGN-BUILD MASTER AGREEMENT (this “Addendum”) is made and entered into as of ___________________, by and between MCNC, a North Carolina nonprofit corporation PO Box 12889, Research Triangle Park, North Carolina 27709 (hereinafter referred to as “Owner”) (“Owner” or “MCNC”), and _______________ with its principal office at ______________________________________________ (the “Contractor”). Both hereinafter, individually, a “Party” and, collectively, the “Parties.”