TRANSATLANTIC TRANSPORT OF FERMILAB 3.9 GHZ CRYOMODULE FOR TTF/FLASH TO DESY*Exchange of Technology Agreement • December 16th, 2023
Contract Type FiledDecember 16th, 2023In an exchange of technology agreement, Fermilab built and will deliver a 3.9 GHz (3rd harmonic) cryomodule to DESY to be installed in the TTF/FLASH beamline. This cryomodule delivery will involve a combination of flatbed air ride truck and commercial aircraft transport to Hamburg Germany. A description of the isolation and damping systems that maintain alignment during transport and protect fragile components is provided. Initially, transport and corresponding alignment stability studies were performed in order to assess the risk associated with transatlantic travel of a fully assembled cryomodule. Shock loads were applied to the cryomodule by using a coldmass mockup to prevent subjecting actual critical components (such as the cavities and input couplers) to excessive forces. Accumulative and peak shock loads were applied through over-the-road testing and using a pendulum hammer apparatus, respectively. Finite Element Analysis (FEA) studies were implemented to define location of inst
TRANSATLANTIC TRANSPORT OF FERMILAB 3.9 GHZ CRYOMODULE TO DESY*Exchange of Technology Agreement • April 30th, 2009
Contract Type FiledApril 30th, 2009In an exchange of technology agreement, Fermilab has built and delivered a 3.9 GHz (3rd harmonic) cryomodule to Deutsches Elektron-Synchrotron (DESY) Laboratory to be installed in the TTF/FLASH beamline. Transport to Hamburg, Germany was completed via a combination of flatbed air ride truck and commercial aircraft, while minimizing transition or handling points. Initially, destructive testing of fragile components, transport and corresponding alignment stability studies were performed in order to assess the risk associated with transatlantic travel of a fully assembled cryomodule. Data logged tri- axial acceleration results of the transport with a comparison to the transport study predicted values are