Guaranteed Maximum Price AmendmentGuaranteed Maximum Price Amendment • August 20th, 2021
Contract Type FiledAugust 20th, 2021accompanying AIA Document A133™–2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the « » day of « » in the year « » (the “Agreement”)
GUARANTEED MAXIMUM PRICE AMENDMENTGuaranteed Maximum Price Amendment • October 21st, 2014
Contract Type FiledOctober 21st, 2014This Guaranteed Maximum Price Amendment (“Amendment”) is entered into by and between the Texas Facilities Commission (hereinafter referred to as “TFC”), a state agency located at 1711 San Jacinto Blvd., Austin, Texas 78701, and J.T. Vaughn Construction, LLC (hereinafter referred to as “CMR”), located at 10355 Westpark Drive, Houston, Texas 77042. This Amendment amends that one certain Construction Manager- at-Risk Contract between TFC and CMR, dated [INSERT DATE] (the “Contract”).
Document A133™ – 2019Guaranteed Maximum Price Amendment • October 16th, 2020
Contract Type FiledOctober 16th, 2020AIA Document A201™–2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified.
Guaranteed Maximum Price AmendmentGuaranteed Maximum Price Amendment • January 16th, 2024
Contract Type FiledJanuary 16th, 2024TO OWNER:Eagle County School District RE-50J PROJECT:McGregor PEMB APPLICATION NO: 23-326-0 Distribution to: Ave. 365 McGregor Drive APPLICATION DATE: 01/16/24 OWNER Eagle, Colorado 81631 Gypsum, CO 81637 OWNERS REP PERIOD FROM: 00/00/2024 ARCHITECT FROM CONTRACTOR:Buildings By Design 18163 MCR 26 VIA Architect:TAB Associates0056 Edwards Village Blvd. Suite 210 PERIOD TO: PROJECT NO: 00/00/2024 23-326 Brush, CO 80723 CONTRACT FOR: Buildings By Design VIA Owner's Rep:Goulding Development AdvisorsTodd Goulding CONTRACT DATE: 9/27/2023