PROPOSAL FOR BIDS, BID, DETAIL SPECIFICATIONS AND STANDARD CONSTRUCTION CONTRACTProposal for Bids • May 5th, 2020 • New York
Contract Type FiledMay 5th, 2020 JurisdictionPage Part A Timetable Part B Definitions Part C Minimum Qualifications Part D Specifications Part E Schedule A Part F Bid Schedule The following Bid Schedule items are required to be completed and submitted at Bid Opening and failure to do so will result in your Bid being determined to be non- responsive: 1. Bid Sheet; 2. Bidder Information, Bid Total, Acknowledgements and Certification; 3. DBE Utilization Goal Form or M/WBE Utilization Requirements and Forms; 4. Bid Security or Bid Bond; and 5. Additional forms may be required pursuant to Attachment 3b. Part G Information for Bidders Part H General Conditions (Boilerplate) Forms required to be completed and submitted within seven (7) Days of Bid Opening. Failure to provide such forms in a timely manner may result in the Bid being determined to be non-responsive or the Bidder non-responsible. Attachment 1a. Tax Affirmation Attachment 1b. EFT Instructions and Form Attachment 1c. Employment Report Instructions and Forms Attac
APPENDIX A BOILERPLATE AGREEMENTProposal for Bids • August 15th, 2017 • New York
Contract Type FiledAugust 15th, 2017 JurisdictionForms required to be completed and submitted within five (5) Days of Bid Opening. Failure to provide such forms in a timely manner may result in the Bid being determined to be non-responsive or the Bidder non-responsible.
PROPOSAL FOR BIDS, BID, DETAIL SPECIFICATIONS AND STANDARD CONSTRUCTION CONTRACTProposal for Bids • May 5th, 2020 • New York
Contract Type FiledMay 5th, 2020 JurisdictionPage Part A Timetable Part B Definitions Part C Minimum Qualifications Part D Specifications Part E Schedule A Part F Bid Schedule The following Bid Schedule items are required to be completed and submitted at Bid Opening and failure to do so will result in your Bid being determined to be non-responsive: 1. Bid Sheet; 2. Bidder Information, Bid Total, Acknowledgements and Certification; 3. DBE Utilization Goal Form or M/WBE Utilization Requirements and Forms; 4. Bid Security or Bid Bond; and 5. Additional forms may be required pursuant to Attachment 3b. Part G Information for Bidders Part H General Conditions (Boilerplate) Forms required to be completed and submitted within seven (7) Days of Bid Opening. Failure toprovide such forms in a timely manner may result in the Bid being determined to be non-responsive or the Bidder non-responsible.
FOR BIDS, BID, DETAIL SPECIFICATIONS AND STANDARD CONSTRUCTION CONTRACT FORProposal for Bids • April 25th, 2012
Contract Type FiledApril 25th, 2012Forms required to be com pleted and submitted within five (5) Days o f Bid Opening. Failure to provide such forms in a timely manner may result in the Bid being determ ined to be non-responsive or the Bidder non-responsible.
PROPOSAL FOR BIDS, BID, DETAIL SPECIFICATIONS AND STANDARD CONSTRUCTION CONTRACTProposal for Bids • March 4th, 2016
Contract Type FiledMarch 4th, 201620GROUP 000 – GENERAL PAGE 010 INTENT 000-2 011 PRINCIPAL CHARACTERISTICS AND GENERAL DESCRIPTION 000-2 012 DEFINITIONS 000-3 25 030 CONTRACT 000-4 040 ADMINISTRATIVE REQUIREMENTS 000-5 040.1 Progress Schedule 040.2 Plan Schedule 040.3 Progress Monitoring 30 040.4 Buy America Compliance 040.5 Material Substitutions 040.6 Purchase Order Technical Approval 068 REFERENCES 000-10 068.1 Contract Drawings and Documents 35 068.2 Intellectual Property Rights 070 REQUIREMENTS FOR DESIGN AND CONSTRUCTION071 Overhead and Clearances 000-13 072 Regulatory Requirements 073 Vibration and Noise 40 074 Welding 076 Guarantee 078 Materials and Workmanship 079 Environmental Conditions 084 EQUIPMENT STORAGE 000-19 45 088 CARE OF VESSEL DURING CONSTRUCTION 000-19 088.1 Fire Protection 088.2 Hull Protection 091 INSPECTION 000-20 096 WEIGHT CONTROL PROGRAM 000-21 50 099 DIGITAL IMAGES 000-21 GROUP