APPENDIX A - TECHNICAL SPECIFICATIONSTechnical Specifications Agreement • July 17th, 2018
Contract Type FiledJuly 17th, 2018This contract shall be executed between JEA and the Electrical Contractor for complete removal and replacement of current roadway lighting infrastructure at Arlington East Water Reclamation Facility (WRF) along the perimeter road. Services include, but are not limited to: installation of new foundations, wiring, poles, splice boxes, LED heads, street light arms, conduit runs and miscellaneous work associated with facility signage repairs. Work to be coordinated with current ongoing site upgrade project. JEA may take action to perform work in house and, thereby, reduce Electrical Contractor workload. These specifications are not intended to supersede Federal, State, or local regulations to which the Electrical Contractor must comply.
ContractTechnical Specifications Agreement • November 18th, 2014
Contract Type FiledNovember 18th, 2014Features◼ SFP Multi-Source Agreement compliance◼ Compliant with 4.25G Fiber Channel 400-M5-SN-I and 400-M6-SN-I standard◼ Compliant with 2.125G Fiber Channel 200-M5-SN-I and 200-M6-SN-I standard◼ Compliant with 1.0625G Fiber Channel 100-M5-SN-I and 100-M6-SN-I Standard◼ Compliant with IEEE802.3z Gigabit Ethernet standard◼ Compliant with SFF8472 diagnostic monitoring interface Duplex LC connector◼ Differential LVPECL inputs and CML outputs◼ Single power supply 3.3V◼ TTL signal detect indicator◼ Hot Pluggable◼ Class 1 laser product complies with EN 60825-1◼ RoHS compliant