Examples of Active Power Output in a sentence
In the case of a power surplus, it shall be possible to reduce the Active Power Output of the Power Generating Module from its previous operating point to any new operating point within the P-Q-Capability Diagram as much as inherently technically feasible, but at least a Active Power output reduction to 55 % of its Maximum Capacity shall be possible.
The Active Power Output shall not be recovered with a gradient above 20% of the Maximum Capacity per minute.
Active Power Output P (MW) Lead Reactive Power capability Qmin (Mvar) Lag Reactive Power capability Qmax (Mvar) Above capability plotted as a P/Q chart if available (Performance Chart) Figure 1: Illustration of P/Q chart Please refer to the examples in the Market Procedures when providing performance charts.
Optimization Results for Different Wind Speeds (a) and Active Power Output of Wind Turbine at 7 m/s Wind SpeedAfter conducting the optimization study for the fixed FFR control, the aeroelastic code HAWC2 is employed in order to analyze the impact of this FFR control on the structural loads.
The Power Generating Modules have to provide Active Power Output P up to the point P1 in accordance with the times t1 and t2 with the values of P1, t1and t2 being specified by the Relevant TSO according to Table 5.
The Crown considered that these were relevant provisions to include within the Central City proposal given that the scheduled activities are located within residential zones and can have a distribution impact on the commercial zones.
The performance is conditional to prime mover availability as well as reduced Maximum Active Power Output at low frequencies for certain generation technologies according to Article 8(1) (d) of the NC RfG.This feature contributes to maintaining and restoring system security.
The Chairperson advised that the modification was drafted in line with industry requests to modify the WFSS on fast acting Active Power Output under Frequency Control response.
With an Emergency Action setpoint issued and Operating in LFSM-U, the Power Park Module should not decrease its Active Power Output beyond the figure that has been instructed in response to high Frequency deviations, however the Power Park Module must respond to low Frequency deviations and increase Active Power Output according to the droop and deadband specified.
A similar approach is defined for the LFC Block operation.Depending on the thresholds the NC LFCR gives the TSOs opportunities or obliges the TSOs to take additional measures including instructions for Power Generating Modules to change the Active Power Output if necessary for Operational Security.