Examples of Asset Set in a sentence
Table 7 introduces the external assets of Asset Set Two.Table 7: Asset Set Two Table 7 (Cont.) Figure 4 illustrates how to determine if an unknown soft IP requires the use of Asset Set Two or if it can continue matching with designs in its functionality after relying on Asset Set One.
Due to this, U_xmit had its assets reassigned using Asset Set Two and was compared against the Champion GRL with its assets also reassigned using Asset Set Two.Table 14: U_xmit.vhd Matching Results Asset Set Two Comparing the same two functionalities regarding Asset Set Two, U_xmit.vhd matches closest to the Communication functionality.
Table 6 presents an example of asset reassignment using Asset Set One.Table 6: Example Asset Set One Reassignment In asset trace 1, the original asset DATA_PERIPHERAL is reassigned to DATA_COMMUNICATION because DATA_PERIPHERAL can also be considered DATA_COMMUNICATION since signals labelled as this asset may communicate with otherdevices.
Once CISS is fully in operation, the system can be used to track audio conversations.
All other subcomponents and the top-level component were required to use Asset Set Two.
Because of this and the possibility of a soft IP’s highest percent Champion GRL match is below a given threshold, a second Asset Set was created.
Table 8 shows the list of assets and corresponding asset categories.Table 8: Asset Set FullTable 8 (Cont.) To establish which asset(s) needs reassignment using the Functionality GRL’s specific characteristic, the same characteristic of the unknown soft IP is used.
Asset Set Stategic function:Deployed/ train&maintainOverall Capability Failure Frequency Maintenance Plan Functional Dependancies Reliability Block Diagram ECO start/deadline Maintenance Plan Inspection plan Fabrication Repair ReplaceAssembly/Disassemblycomponent stock (inc.
Future work can continue to grow the list of functionalities as well as improve designs within the Champion GRL to decrease the use of Asset Set Two.
Erect part 6/part 7 storey building comprising 126 bedroom hotel with restaurant and bar to first floor and lay out 94 car parking spaces, cycle store and refuse store.