Bandwidth Test definition

Bandwidth Test shall have the meaning set forth in Schedule F.

Examples of Bandwidth Test in a sentence

  • In addition, a Bandwidth Test shall be performed on all multimode optical fibers.

  • Total Vector Error (TVE) of the PMU under Bandwidth Test It can be clearly investigated from Fig 8 and Fig 9, that the quality of performance of the PMU deteriorates when compared to the steady state tests.

  • Iperf reports band- width, delay jitter, and datagram loss.• Bandwidth Test Controller (BWCTL) [4] is a com- mand line client application and a scheduling and policy daemon that wraps the Iperf application.

  • Varying Throughput With On Demand Bandwidth (Test at 3Mbps) In [15], the authors present a fully distributed MAC pro- tocol implemented on the WARP platform.

  • Bandwidth Test: Select ON to permit the adjustment of how much bitrate goes through each available WWAN adapter.Protocol: This setting default to LDMP, the new two-way communication protocol for Streambox Avenir Mini and its Streambox Decoder.

  • In the proposed infrastructure measurements using the perfSONAR Toolkits we are actively measuring both achievable throughput (BWCTL – Bandwidth Test Controller), and one-way delay and losses (using OWAMP – One-way Active Measurement Protocol) between islands.

  • Frequency Error (FE) of the PMU under test during Bandwidth Test Fig.

  • Figure 11 7104 Bandwidth Test Curve From the bandwidth test curve, 7104's bandwidth is in the 20M range, will not interference the adjacent channel signal.

  • During the term of this Agreement, Xxxxxx shall devote such working time, attention and energies to the business of the Company, as is necessary or appropriate for the performance of her duties as Administrative Director of the Company.

  • Varying Loss (%) With On Demand Bandwidth (Test at 3Mbps) Slotted Seeded Channel Hopping (SSCH) algorithm [18] use a channel hopping approach.

Related to Bandwidth Test

  • Bandwidth means a distributor’s defined tolerance used to flag data for further scrutiny at the stage in the VEE process where a current reading is compared to a reading from an equivalent historical billing period. For example, a 30 percent bandwidth means a current reading that is either 30 percent lower or 30 percent higher than the measurement from an equivalent historical billing period will be identified by the VEE process as requiring further scrutiny and verification;

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Cannabis testing facility means an entity registered by

  • S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Service Level means the standard set forth below by which IBM measures the level of service it provides in this SLA.

  • Service Levels means the service levels to be met by the Services as referenced in the Contract Letter and set out in the Specification Schedule.

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • low voltage means the set of nominal voltage levels that are used for the distribution of electricity and whose upper limit is generally accepted to be an a.c. voltage of 1000V ( or a d.c. voltage of 1500 V). [SANS 1019]

  • Monitoring System means a system established by BNY to fulfill the Responsibilities specified in clauses (d) and (e) of Section 1 of Article III of this Agreement.

  • Sound level meter means an instrument which includes a microphone, amplifier, RMS detector, integrator or time averager, output meter, and weighting networks used to measure sound pressure levels.

  • 2 Wire Analog Voice Grade Loop or “Analog 2W” provides an effective 2-wire channel with 2-wire interfaces at each end that is suitable for the transport of analog Voice Grade (nominal 300 to 3000 Hz) signals and loop-start signaling. This Loop type is more fully described in Verizon Technical Reference (TR)-72565, as revised from time-to-time. If “Customer-Specified Signaling” is requested, the Loop will operate with one of the following signaling types that may be specified when the Loop is ordered: loop-start, ground-start, loop- reverse-battery, and no signaling. Customer specified signaling is more fully described in Verizon TR-72570, as revised from time-to- time. Verizon will not build new facilities.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Process weight means the total weight of all materials introduced into any source operation. Solid fuels charged will be considered as part of the process weight, but liquid and gaseous fuels and combustion air will not.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Customer-Funded Upgrade means any Network Upgrade, Local Upgrade, or Merchant Network Upgrade for which cost responsibility (i) is imposed on an Interconnection Customer or an Eligible Customer pursuant to Tariff, Part VI, section 217, or (ii) is voluntarily undertaken by a New Service Customer in fulfillment of an Upgrade Request. No Network Upgrade, Local Upgrade or Merchant Network Upgrade or other transmission expansion or enhancement shall be a Customer-Funded Upgrade if and to the extent that the costs thereof are included in the rate base of a public utility on which a regulated return is earned.

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.