City’s Site definition

City’s Site means any land and/or premises owned by the City on which or in respect of which the Services are performed by the Consultant;
City’s Site means any land and/or premises owned by the City on which or in respect of which the Services are performed by the Auditor;

Examples of City’s Site in a sentence

  • The Healthcare Campus Centre is subject to Site Plan Control in accordance with the City’s Site Plan Control By-law.

  • Compute runoff control volumes• Calculate the WQv for the drainage area using the City’s Site Development Review Tool.Step 2.

  • This largely parallels the division in the City’s Site Plan Control Areas By-law (By-Law 2010-220) between developments which require a site plan agreement and those that do not.The DCs are to be paid on the date which is the earliest of: a) six months from date of issuance of building permit; b) the issuance of the occupancy permit; or c) the sale or transfer of the property.

  • Compute runoff control volumes• Calculate the WQv for the drainage area using the City’s Site Development Review Tool.• Calculate the 100-year discharge to the bioretention area.Step 2.

  • The designer would need to calculate the required WQv using the City’s Site Development Review Tool (there is not enough information in the example to include a value here).

  • For multiple-family projects, the applicant is required to complete the City’s Site Plan Review process, which is typically a 6 to 8 week process from the time an application is filed and building permits are issued for the project.

  • Compute runoff control volumesThe calculated WQv for the drainage area using the City’s Site Development Review Tool is 0.068 ac-ft.Calculate the flow to the swale for the water quality storm event (P=1.2 inches) using TR-55.

  • If required, the City’s Site Plan Review process focuses on the physical design of buildings to ensure that they are compatible with adjacent properties in terms of building height, scale, and privacy (e.g., building separation and placement of windows, decks and balconies), and that topographic features are preserved to the extent feasible.

  • Compute runoff control volumesThe WQv for the infiltration trench would be calculated using the City’s Site Development Tool.

  • Permits for development of phases or sub-phases shall be submitted for approval through the City’s Site Plan process.

Related to City’s Site

  • The Site, where applicable, means the designated project place(s) named in the bidding document.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Sites means the area(s) upon or in which the construction work is carried on, and such other areas adjacent thereto as may be designated by the Commissioner.

  • Site means the place or places where the permanent Works are to be carried out including workshops where the same is being prepared.