Class II Commercial Disposal Well definition

Class II Commercial Disposal Well means a permitted Class II well in which Class II Fluids are injected, for which the Permit Holder receives deliveries of Class II Fluids by tank truck from multiple oil and gas well operators, and either charges a fee at the disposal well facility or purchases the Class II Fluids at the source for subsequent transport to the disposal well facility for the specific purpose of disposal of the delivered Class II Fluids.

Examples of Class II Commercial Disposal Well in a sentence

  • A specification as to the type of Class II well being permitted as a Class II Disposal Well or a Class II Commercial Disposal Well.

  • A New Permit Holder may operate Class II Disposal or Class II Commercial Disposal Wells covered by the Class II Disposal or Class II Commercial Disposal Well transfer request, until such time as the transfer request has been approved or denied by the Director or his designee, provided the request was submitted within thirty (30) days of the actual transfer of the Class II Disposal or Class II Commercial Disposal Well.

  • This rule applies to all pits constructed during the drilling, completion and testing of a brine, oil, gas, or oil and gas production well, brine injection or disposal well, Class II Disposal Well, and Class II Commercial Disposal Well.

  • In lieu of the signature of the New Permit Holder, the Current Permit Holder may submit documentation evidencing transfer of the ownership of the Class II Disposal or Class II Commercial Disposal Well, lease, or unit in the event the New Permit Holder refuses to sign the notification of transfer form.

  • A separate form shall be completed for each lease, Class II Disposal or Class II Commercial Disposal Well, or other unit transferred.

  • Unless otherwise approved by the Commission, no person shall inject into a well which does not have at a minimum, five hundred (500) feet for a Class II Disposal Well or seven hundred-fifty (750) feet for a Class II Commercial Disposal Well, of confining layers between the base of the lowermost USDWs and the top of the injection interval, with no individual confining layer being less than 50 feet in thickness.

  • Movement of the Class II Disposal or Class II Commercial Disposal Well location off the original surface owners’ property, or after surface casing has been set, will require the filing of a new permit application, along with a new permit fee and plat.

  • Notification of a transfer shall be given to the Director, or his designee, by the Current Permit Holder, on a form prescribed by the Director, of the transfer of any Class II Disposal or Class II Commercial Disposal Well or any Class II Disposal or Class II Commercial Disposal Well required to be permitted within thirty (30) days after the effective date of the transfer.

  • If any Class II Disposal or Class II Commercial Disposal Well, or any lease or other unit associated with the Class II Disposal or Class II Commercial Disposal Well, is in violation at the time of the transfer request to the New Permit Holder, the transfer request shall be denied pending abatement of all violations by the Current Permit Holder.

  • However, Class II Disposal or Class II Commercial Disposal Wells may not be operated by the New Permit Holder, until a Class II Disposal or Class II Commercial Disposal Well transfer request is approved, if the request was received by the Director, or his designee, more than thirty (30) days after the actual transfer of the Class II Disposal or Class II Commercial Disposal Well.

Related to Class II Commercial Disposal Well

  • Residual disinfectant concentration means the concentration of disinfectant measured in mg/L in a representative sample of water.

  • chemical tanker means a ship constructed or adapted and used for the carriage in bulk of any liquid product listed in chapter 17 of the International Bulk Chemical Code;

  • Class I area means a mandatory visibility protection area designated pursuant to section 169A of the federal Clean Air Act.

  • Commercial driver s license" means:

  • Maximum residual disinfectant level or “MRDL” means a level of a disinfectant added for water treatment that may not be exceeded at the consumer’s tap without an unacceptable possibility of adverse health effects.

  • Cannabis cultivation facility means a person that:

  • Commencement of Commercial Production means the first occurrence of Commercial Production in an Area.

  • Natural Gas Liquids means those hydrocarbon components that can be recovered from natural gas as a liquid including, but not limited to, ethane, propane, butanes, pentanes plus, and condensates;

  • Unstable area means a location that is susceptible to natural or human-induced events or forces capable of impairing the integrity of some or all of the landfill structural components responsible for preventing releases from a landfill. Unstable areas can include poor foundation conditions, areas susceptible to mass movements, and Karst terranes.

  • pre-commercial procurement means the procurement of research and development services involving risk-benefit sharing under market conditions, and competitive development in phases, where there is a clear separation of the research and development services procured from the deployment of commercial volumes of end-products;

  • High global warming potential hydrofluorocarbons means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables of alternatives available at (http://www.epa.gov/snap/ ).

  • Facility Production Limit means the production limit placed on the main product(s) or raw materials used by the Facility that represents the design capacity of the Facility and assists in the definition of the operations approved by the Director.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Loan Commencement Date means, with respect to each Loan, the first Business Day of the calendar month following the Funding Date of such Loan.

  • Non-Methane Hydrocarbons (NMHC means the sum of all hydrocarbon air pollutants except methane.

  • Scheduled Commercial Operation Date shall have the meaning ascribed to it in Clause 5.4.1;

  • Gas Year means the period of 365 or 366 Gas Days, as the case may be, beginning at October 1st at 06:00 hours (Belgian time) and ending at September 30th 06:00 hours (Belgian time) of the next year.

  • Dry cleaning facility means an establishment with one or more dry cleaning systems.

  • Facility component means any part of a facility, including equipment.

  • Cannabis testing facility means an entity registered by

  • COVID-19 case means a person who:

  • Cogeneration facility means a power plant in which the heat or steam is also used for industrial or commercial heating or cooling purposes and that meets Federal Energy Regulatory Commission standards for qualifying facilities under the Public Utility Regulatory Policies Act of 1978 (16

  • Disposal facility means a facility or part of a facility at which hazardous waste is intentionally placed into or on any land or water, and at which waste will remain after closure. The term disposal facility does not include a corrective action management unit into which remediation wastes are placed.

  • Commercial Production means the operation of the Property or any portion thereof as a producing mine and the production of mineral products therefrom (excluding bulk sampling, pilot plant or test operations);

  • generation facility means a facility for generating electricity or providing ancillary services, other than ancillary services provided by a transmitter or distributor through the operation of a transmission or distribution system, and includes any structures, equipment or other things used for that purpose;

  • waste disposal facility means an individual or entity that has been issued a medical marijuana waste disposal facility license by the Department to dispose of medical marijuana waste as authorized in Oklahoma law and these Rules.