Construction Buffer Zone Easement Area definition

Construction Buffer Zone Easement Area is defined in Section 2.3(I) and is legally described in Exhibit R-1.
Construction Buffer Zone Easement Area has the meaning given such term in Section 2.3(I) of this Exhibit A.

Examples of Construction Buffer Zone Easement Area in a sentence

  • It is agreed and understood that Fertilizer Company shall have the right to at any time terminate such use by Refinery Company upon giving no less that thirty (30) days prior written notice, and if such notice is so given, Refinery Company shall remove all of its equipment and other property within the Construction Buffer Zone Easement Area it is so using and shall restore such portion to the same condition as existed prior to Refinery Company’s entry for staging purposes.

  • It is agreed and understood that CRNF shall Exhibit A have the right to at any time terminate such use by CRRM upon giving no less than 30 days prior written notice, and if such notice is so given, CRRM shall remove all of its equipment and other property within the Construction Buffer Zone Easement Area it is so using and shall restore such portion to the same condition as existed prior to CRRM’s entry for staging purposes.

Related to Construction Buffer Zone Easement Area

  • Easement Area means the area of the servient lot marked on the survey-strata plan as being subject to the relevant easement; and

  • Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.

  • ILUA Area means the geographical area in relation to which the Framework ILUA applies, as specified in Schedule 2 of the Framework ILUA;

  • Project site, where applicable, means the place indicated in bidding documents.

  • Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Utility easement means a right held by a facility operator to install, maintain, and access an underground facility or pipeline.

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • Plant Site (Works, Factory) means the local integration of one or more plants, with any intermediate administrative levels, which are under one operational control, and includes common infrastructure, such as:

  • Construction Zone shall have the meaning set forth in Clause 8.3 (i);

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • construction site means a workplace where construction work is being performed;

  • Redevelopment Area means the community redevelopment area described, defined or otherwise identified or referred to in the Redevelopment Plan.

  • Excavation zone means the volume containing the tank system and backfill material bounded by the ground surface, walls, and floor of the pit and trenches into which the UST system is placed at the time of installation.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Drainage area means a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody.

  • Rural areas means any area within the county located outside the

  • Coastal area means coastal area as defined in section 22a-93(3) of the Connecticut General Statutes. “Coastal waters” means coastal waters as defined in section 22a-93(5) of the Connecticut General Statutes. “Commissioner” means commissioner as defined in section 22a-2(b) of the Connecticut General Statutes.

  • Storage area means any location, facility, or vehicle which is used to store, to transport, or to secure a radiographic exposure device, a storage container, or a sealed source when it is not in use and which is locked or has a physical barrier to prevent accidental exposure, tampering with, or unauthorized removal of the device, container, or source.

  • Underground facility means any item which shall be buried or placed below ground for use in connection with the storage or conveyance of water, sewage, electronic, telephone or telegraphic communications, electric energy, oil, gas or other substances, and shall include, but not be limited to pipes, sewers, conduits, cables, valves, lines, wires, manholes, attachments and those portions of poles and their attachments below ground.

  • Garage shall have the meaning ascribed to it in Recital H;

  • Basal area means the effective surface area available to transmit the treated effluent from the filter media in a mound system into the in-situ receiving soils. The perimeter is measured at the interface of the imported fill material and in-situ soil. On sloping sites, only the area down-gradient from the up-slope edge of the distribution media may be included in this calculation.

  • Permit area means the area constituted by the blocks that are the subject of a permit;

  • Facility Site means the site described in Schedule B. “FERC” means the Federal Energy Regulatory Commission.

  • Survey Area means the area of land or waters the subject of a Survey, or proposed to be the subject of a Survey.

  • Building Permit means a permit for the construction of one or more Units, issued by the City, or other public agency in the event the City no longer issues said permits for the construction of Units within CFD No. 11. For purposes of this definition, "Building Permits" shall not include permits for construction or installation of commercial/industrial structures, parking structures, retaining walls, and utility improvements not intended for human habitation.