Cyclic Meter Reading definition

Cyclic Meter Reading means a Meter Reading carried out to an agreed frequency and obtained in accordance with Pelican’s Field Itinerary from time to time;

Examples of Cyclic Meter Reading in a sentence

  • Cyclic Meter Reading By the end of the second week of each calendar month, Pelican shall provide the Retailer with a Cyclic Read Schedule setting out those Cyclic Meter Reads due over the next Target Read Period.

Related to Cyclic Meter Reading

  • high voltage means the classification of an electric component or circuit, if its working voltage is > 60 V and ≤ 1500 V DC or > 30 V and ≤ 1000 V AC root mean square (rms).

  • low voltage means the set of nominal voltage levels that are used for the distribution of electricity and whose upper limit is generally accepted to be an a.c. voltage of 1000V ( or a d.c. voltage of 1500 V). [SANS 1019]

  • Integrated Digital Loop Carrier means a subscriber loop carrier system that is twenty-four (24) local Loop transmission paths combined into a 1.544 Mbps digital signal which integrates within the switch at a DS1 level.

  • Low terrain means any area other than high terrain.