Examples of ESB 752 in a sentence
The Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications, ESB 752 and ESB 750.
Any curtailment of deliveries over the National Grid Interconnection Facilities and National Grid Transmission System shall be governed by Good Utility Practice, the terms and conditions of the NYISO Tariffs, ESB 752, National Grid's standard practices and procedures.
As per ESB 752, the Interconnection Customer shall install the RTU indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries.
As per ESB 752, the Interconnection Customer shall install the RTU indoors and within 15 feet of the meter(s), and remote from: • Heavy traffic areas, work areas, and loading areas; • Heat producing or high electrostatic or electromagnetic field producing equipment; and • Station batteries.
The Interconnection Customer will install a meter panel in accordance with ESB 752 and ESB 750.
The Interconnection Customer shall provide meter equipment mounting in accordance with ESB 752 Section VII.
The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon review of the Interconnection Customer’s design documents according to ESB 752.
The Company granted more options in the current period as compared to the number of options granted in the comparative period.
As per ESB 756 and ESB 752, the Interconnection Customer shall install the RTU indoors and within 15 feet of the meter(s) and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries.
To the extent there are discrepancies between the ESB 752 and the Middle Road Functional Specification, the requirements of the Middle Road Functional Specification shall be applied.