Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.
Scheduled Construction Period means the period commencing from the Appointed Date and ending on Scheduled Completion Date;
Acquisition Value of the Common Stock means, for each Trading Day in the Valuation Period, the value of the consideration paid per share of Common Stock in connection with such Public Acquirer Change of Control, as follows:
Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.
Baseline Value for each of the Company and the Peer Companies means the dollar amount representing the average of the Fair Market Value of one share of common stock of such company over the five consecutive trading days ending on, and including, the Effective Date.
RI Value means, in respect of a Reference Item and a ST Valuation Date, (i) the RI Closing Value for such Reference Item in respect of such ST Valuation Date, divided by (ii) the relevant RI Initial Value (expressed as a percentage).
Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.
New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.
Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.
Original construction ’ shall mean the first or initial construction
Inventory Value has the meaning set forth in Section 2.1.
Option Value means the value of an Option based on the Black and Scholes Option Pricing model obtained from the “OV” function on Bloomberg determined as of the day prior to the public announcement of the applicable Option for pricing purposes and reflecting (i) a risk-free interest rate corresponding to the U.S. Treasury rate for a period equal to the remaining term of the applicable Option as of the applicable date of determination, (ii) an expected volatility equal to the greater of (a) 100% and (b) the 100 day volatility obtained from the HVT function on Bloomberg as of the day immediately following the public announcement of the issuance of the applicable Option, (iii) the underlying price per share used in such calculation shall be the highest Weighted Average Price of the Common Stock during the period beginning on the day prior to the execution of definitive documentation relating to the issuance of the applicable Option and the public announcement of such issuance and (iv) a 360 day annualization factor.
Transaction Value means the actual contract value (the bid sum or price) in South African currency, inclusive of all applicable taxes in respect of the goods, services or construction works that are contracted for.
Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.
Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.
Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of