Operational Control means Security monitoring, adjustment of generation and transmission resources, coordinating and approval of changes in transmission status for maintenance, determination of changes in transmission status for reliability, coordination with other Balancing Authority Areas and Reliability Coordinators, voltage reductions and load shedding, except that each legal owner of generation and transmission resources continues to physically operate and maintain its own facilities.
Final Completion Date means the date on which Final Completion occurs.
Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.
final consumer means the ultimate consumer of a foodstuff who will not use the food as part of any food business operation or activity.
Original contractor means a person, including an owner-builder, that contracts with an owner to provide preconstruction service or construction work.
Control Appraisal Period shall exist with respect to the Mortgage Loan, if and for so long as:
Internal control means a process effected by an entity's governing board, management, and other personnel, designed to provide reasonable assurance regarding the achievement of objectives in the following categories:
area control service means air traffic control service for controlled flights in control areas;
Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
Institutional control means the continued surveillance, monitoring, and care of the disposal site after site closure and stabilization to insure the protection of the public health, safety, and welfare, and the
Internal control over financial reporting means a process effected by an insurer’s board of directors, management and other personnel designed to provide reasonable assurance regarding the reliability of the financial statements, i.e., those items specified in Section 5(B)(2) through 5(B)(7) of this regulation and includes those policies and procedures that:
Critical control point means a point, step, or procedure in a food proc- ess at which control can be applied, and a food safety hazard can as a result be prevented, eliminated, or reduced to acceptable levels.
Completion Date means the date of completion of the Services by the Service Provider as certified by the Procuring Entity
Final Completion Certificate has the meaning set forth in Section 11.6.
Original Contract means the initial contract or price agreement solicited and awarded during a cooperative procurement by an administering contracting agency.
Independent expenditure means an expenditure by a person:
Area Control Error or “ACE” shall mean the instantaneous difference between a Balancing Authority’s net actual and scheduled interchange, taking into account the effects of Frequency Bias and correction for meter error.
Child custody determination means a judgment, decree, or other order of a court providing for the legal custody, physical custody, or visitation with respect to a child. The term includes a permanent, temporary, initial, and modification order. The term does not include an order relating to child support or other monetary obligation of an individual.
Final Consideration means the entire consideration proposed by a Successful Bidder(s) in the course of the E-Auction, and required to be paid by the Successful Bidder(s) on Consideration Payment Date to acquire the Corporate Debtor as a whole on a going concern.
Internal Control Event means a material weakness in, or fraud that involves management or other employees who have a significant role in, the Company’s internal controls over financial reporting, in each case as described in the Securities Laws.
Substantial Completion Date means the date on which Substantial Completion occurs.
Event Outside Our Control means any act or event beyond WRAS’s reasonable control, including without limitation strikes, lock-outs or other industrial action by third parties, civil commotion, riot, invasion, terrorist attack or threat of terrorist attack, war (whether declared or not) or threat or preparation for war, fire, explosion, storm, flood, earthquake, subsidence, epidemic or other natural disaster, or failure of public or private telecommunications networks [or impossibility of the use of railways, shipping, aircraft, motor transport or other means of public or private transport;
approach control service means air traffic control service for arriving or departing controlled flights;
Project Completion Date means the date on which the Completion Certificate is issued;
Replenishment Amount has the meaning assigned to such term in Section 2.06(b).
aerodrome control service means air traffic control service for aerodrome traffic;