Examples of FSRU Terminal in a sentence
If such serious incident occurs, the LNG carrier Master must report all incidents referring to cargo (LNG) vapor venting to the FSRU/ Terminal Operator immediately after such incident has occurred and take action to prevent further accidental venting of the cargo in the atmosphere.
The mooring plan shall be based on a study that takes into account OCIMF guidelines and shall be agreed to between the FSRUand the LNGC LNGCcannot comply with the Mooring Plan, the FSRU &Terminal must be notified immediately, the FSRU andTerminal takes no liability in terms of material damage or delay for any deviation.
The permanently berthed FSRU Terminal concept is assumed to be fully self-sufficient in providing power, water and life-support on-board.All receiving facilities, marine structures such as jetty, mooring and breasting dolphins, unloading platforms and breakwater that are required together with dredging of the berth, turning circle and access channel connection to main shipping channel, will be designed to comply with the FSRU vessel and in order to ensure the compatibility with the visiting LNG shuttles.
Figure 13: LNG carrier manoeuvre in a FSRU Terminal Therefore, the objective of these studies is the identification, analysis and evaluation of the different risk assumptions that might be expected during the development of the access and loading/unloading operations.
Chandler declined to do so, since it would disrupt arrangements already made (that is, a full schedule of sales to be made of various stocks) and telephoned Blackwell to inform him of Nelson’s approach.
The Parties will use reasonable endeavours to develop and agree a commissioning procedure in respect of the Start Up Period no later than ***** (*****) days prior to Vessel’s arrival at the FSRU Terminal, including final testing and commissioning of the Modification Work.
The Company is primarily engaged in the FSRU Terminal which the Management and CODM recognise as the sole business segment.
The boat landing platform is used for personnel transfer during normal operations of the terminal at the offshore site.STS Operations:The FSRU Terminal is fitted with an offshore Hose Handling Crane certified for personnel transfer.
We recognise some members found the change extremely difficult and we want to learn from this in future.
Since late 2018 and as Glaucus-1 reserves came into light, the Cypriot government promotes the construction of Vasilikos FSRU Terminal with a storage capacity of 125.000 cbm, capable to accommodate LNG carriers ranging in size from120.000 cbm to 217.000 cbm47.In 2018, DESFA’s Revythousa LNG Terminal was expanded by adding a third tank, raising storage capacity to 225.000 cbm from 130.000 cbm and annual capacity at 7 billion cbm48.