General Work Schedule definition

General Work Schedule. For a typical work week, indicate in the spaces below the number of hours to be worked as Telework (T) vs. the number of hours to be worked in Office (O). For any “O” hours, indicate location where office hours will be worked, example: “Hoteling Station in ▇▇▇▇ ▇. ▇▇▇▇▇▇▇ Blvd., Oklahoma City, OK 73105.” Number of Hours Location O = Office / T = Telework; If “O”, list where Monday     Tuesday     Wednesday     Thursday     Friday     Saturday     Sunday     Daily Lunch     State-Owned Equipment (including telecommunication services):             Employee-Owned Equipment (including telecommunication services):       Appendix B to [Agency] Telework Agreement [Agency]/  Insert Telework Position Duties   Appendix C to [Agency] Telework Agreement [Agency]/  Primary Telework Location Safety Checklist The space is safe and hazard free. Yes No The space is adequately ventilated. Yes No The space is reasonably quiet, free of distractions and there is sufficient light for reading. Yes No All the stairs with four or more steps are equipped with handrails. Yes No All circuit breakers and/or fuses in the electrical panel are labeled as to intended service. Yes No Circuit breakers clearly indicate if they are in open or closed positions. Yes No All electrical equipment is free of recognized hazards that would cause physical harm (e.g., frayed wires, bare conductors, loose wires, flexible wires running through walls, exposed wires fixed to the ceiling). Yes No Electrical outlets are three-pronged (grounded). Yes No Computer equipment is connected to a surge protector. Yes No Aisles, doorways and corners are free of obstructions to permit movement. Yes No File cabinets and storage closets are arranged so drawers and doors do not open into walkways. Yes No Space is free from excess furniture. Yes No Phone lines, electrical cords and extension wires are secured under a desk or alongside baseboard. Yes No Floor surfaces are clean, dry, level and free of worn or frayed seams. Yes No Carpets are well secured to the floor, and free of frayed or worn seams. Yes No A fire extinguisher is in the workspace or easily accessible. Yes No A working smoke detector is detectable from the workspace. Yes No
General Work Schedule. For a typical work week, indicate in the spaces below the number of hours to be worked as telework (T) vs. the number of hours to be worked on campus (O). Numbers of Hours Location Worked (T = Telework, O = On Campus) Example: Monday 44 T O Sunday Monday Tuesday Wednesday Thursday Friday Saturday Item Name/Description Model/Serial Number Condition (circle one) Poor Fair Good Like New New Poor Fair Good Like New New Poor Fair Good Like New New Poor Fair Good Like New New Poor Fair Good Like New New Employee Name Employee Signature Date Employee Name: Employee Title: Employee Banner ID#: Supervisor Name: Supervisor Title: Describe the employee performance expectations in regards to communication. Insert a description of how the employee’s work output will be further supervised, monitored, and measured. Employee Name Employee Signature Date Employee Name: Employee Title: Employee Banner ID#: Supervisor Name: Supervisor Title:
General Work Schedule means the work schedule set out at Schedule “G”;

Examples of General Work Schedule in a sentence

  • The Services shall be constructed, installed or otherwise provided in conformity with the General Work Schedule set out in Schedule “G” but the Director of Engineering shall at all times have the right to reschedule the construction of any Services in such order and in such priority as the Director of Engineering, in his or her sole discretion, deems advisable and the Owner shall abide by such rescheduling.

  • For the avoidance of all doubt, the Parties state that the cost of this training session is included in the contracted Price of the Works under this Agreement and will be calculated separately on the invoice; The preparation of a detailed work-in-progress schedule, which will be created and maintained while respecting the maximum time of duration and dates set out in the General Work Schedule (hereinafter “Detailed Schedule”).

Related to General Work Schedule

  • Work Schedule means the approved order and timeline for how the requirements of this contract, including Work on individual Units or groups of Units, will be fulfilled by the Contractor.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Annual Work Plan means each annual work plan, together with the related budget, for the Project approved by the Association pursuant to the provisions of Section I.B.3 of Schedule 2 to this Agreement.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Project Description means the document that describes the Project's Reduction activities and that uses either the VCS Project Description Template or the project description template specified by the relevant Approved GHG Program;