Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.
Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.
Phase 3 Trial means a human clinical trial of a Product on a sufficient number of subjects that is designed to establish that a pharmaceutical product is safe and efficacious for its intended use, and to determine warnings, precautions and adverse reactions that are associated with such pharmaceutical product in the dosage range to be prescribed, which trial is intended to support Approval of a Product, as described in 21 C.F.R. 312.21(c) for the United States, or a similar clinical study prescribed by the Regulatory Authorities in a foreign country.
Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
System Impact Study means an assessment by the Transmission Provider of (i) the adequacy of the Transmission System to accommodate a Completed Application, an Interconnection Request or an Upgrade Request, (ii) whether any additional costs may be incurred in order to provide such transmission service or to accommodate an Interconnection Request, and (iii) with respect to an Interconnection Request, an estimated date that an Interconnection Customer’s Customer Facility can be interconnected with the Transmission System and an estimate of the Interconnection Customer’s cost responsibility for the interconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested system upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to provide the requested incremental rights. “System Protection Facilities” shall refer to the equipment required to protect (i) the Transmission System, other delivery systems and/or other generating systems connected to the Transmission System from faults or other electrical disturbance occurring at or on the Customer Facility, and (ii) the Customer Facility from faults or other electrical system disturbance occurring on the Transmission System or on other delivery systems and/or other generating systems to which the Transmission System is directly or indirectly connected. System Protection Facilities shall include such protective and regulating devices as are identified in the Applicable Technical Requirements and Standards or that are required by Applicable Laws and Regulations or other Applicable Standards, or as are otherwise necessary to protect personnel and equipment and to minimize deleterious effects to the Transmission System arising from the Customer Facility.
Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.
Development Phase means the period before a vehicle type is type approved.
Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.
MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;
Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.
Phase 2 Clinical Trial means a human clinical trial, for which the primary endpoints include a determination of dose ranges or an indication of efficacy in patients being studied as described in 21 C.F.R. §312.21(b), or an equivalent clinical trial in a country in the Territory other than the United States.
Plasma arc incinerator means any enclosed device using a high intensity electrical discharge or arc as a source of heat followed by an afterburner using controlled flame combustion and which is not listed as an industrial furnace.
Phase 2 Trial means a human clinical trial conducted on study subjects with the disease or condition being studied for the principal purpose of achieving a preliminary determination of efficacy or appropriate dosage ranges, as further described in 21 C.F.R. §312.21(b) (including any such clinical study in any country other than the United States).
Launch Vehicle means an object, or any part thereof, intended for launch, launched from Earth, or returning to Earth which carries Payloads or persons, or both.
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.
Phase IIb Clinical Trial means a clinical trial of a Product on sufficient numbers of patients that is designed to provide a preliminary determination of safety and efficacy of such Product in the target patient population over a range of doses and dose regimens.
Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.
smart metering system means an electronic system that is capable of measuring electricity fed into the grid or electricity consumed from the grid, providing more information than a conventional meter, and that is capable of transmitting and receiving data for information, monitoring and control purposes, using a form of electronic communication;
Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.
Clinical Trial means any human clinical trial of a Product.
Phase 1 Clinical Trial means a Clinical Trial of a Product on sufficient numbers of normal volunteers and/or patients that is designed to establish that such Product is safe for its intended use and to support its continued testing in Phase 2 Clinical Trials. For purposes of this Agreement, ‘initiation’ of a Phase 1 Clinical Trial for a Product means the first dosing of such Product in a human subject in a Phase 1 Clinical Trial.
Maintenance Outage means a time period during which Seller plans to reduce the Power Output of the Power Product, in full or in part, in order to facilitate maintenance work on the Generating Facility, other than a Major Overhaul.
Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI.
Generator Set means a switcher locomotive equipped with multiple engines that can turn off one or more engines to reduce emissions and save fuel depending on the load it is moving.
medium voltage means the set of nominal voltage levels that lie above low voltage and below high voltage in the range of 1 kV < Un 44 kV. [SANS 1019]