At a minimum, governors shall be fully responsive to frequency deviations consistent with the requirements of NERC, SERC and the Georgia Power Electric System during normal operating conditions only, as defined by Good Utility Practices.
The governors shall be properly maintained and shall provide droop characteristics consistent with the requirements of NERC, SERC and the Georgia Power Electric System.
Upon completion of the actions and reviews required under Sections 8.1, 8.2, and 8.3, Generator may request approval for initial synchronization of the Facility with the Georgia Power Electric System.
Georgia Power shall provide the data protocol, and Generator shall install as part of the Interconnection Facilities any equipment necessary to deliver telemetered signals to Georgia Power specifying the voltage and watts, vars, and watthours delivered to the Georgia Power Electric System at the Interconnection Point.
Generator shall operate its generating equipment in parallel with the Georgia Power Electric System in accordance with the operating procedures in Appendix A to this Agreement and those established by the Operating Committee in accordance with Section 15 and in accordance with the requirements of the NERC-recognized control area in which the Facility operates.
Consistent with Good Utility Practices and unless otherwise agreed to by the Parties, all Interconnection Facilities shall be complete prior to the initial synchronization of the Facility with the Georgia Power Electric System.
Upon termination of this Agreement (whether due to the expiration of the Term or due to a Default as described in Section 3.2), Georgia Power may permanently disconnect the Facility from the Georgia Power Electric System in accordance with Good Utility Practices.
Generator shall not, without Georgia Power's prior written approval (which shall not be unreasonably withheld or delayed), make any change to its Facility which might adversely affect the operation of the Georgia Power Electric System.
When Generator is delivering power to the Georgia Power Electric System, Generator shall operate its generation to meet the voltage schedule, as measured at the transmission bus serving the Facility, communicated by the Georgia ITS operator.
Tenaska shall comply with the National Fire Protection Association Code, the American National Electrical Code, the National Electrical Safety Code and other applicable code requirements in the same manner as required by the Georgia Power Electric System for generating plants owned and/or operated by Georgia Power.