KDV 500 means the system of components, including all of the structural steel, piping, pumps, vessels, control systems, wiring, two proprietary “mixing turbine pumps” and the operations, maintenance and start-up manuals provided by AK, to convert hydrocarbon feedstock, including any Feedstock, into diesel oil using the Technology which is capable of producing a minimum of 500 liters of diesel oil per hour.
KDV 500 means a System capable of producing a minimum of 500 liters of diesel oil per hour.”

Examples of KDV 500 in a sentence

  • The Parties are aware that the current price of a KDV 500 includes a technology fee of [*****] and acknowledge that the minimum technology fee to AK from the sale of a System in the future, as arrangements are put in place by AK to broaden the manufacturing base and reduce the total cost of the Systems will include a technology fee not to exceed [*****].

  • The purchase price of the KDV 500 to be ordered for the Demonstration Plant shall be [*****], which includes the cost of the equipment and components that are required to recover the catalyst, and the cost of delivering the KDV 500 to the Demonstration Plant site in the United States, assembling it, starting it up and making it ready for commercial operation.

  • If Covanta decides to order the KDV 500 with a single proprietary mixing turbine pump, the price of the KDV 500 shall be [*****].

  • KDV $50.0 PLOOLRQ RI ([WHQGDEOH 0DWXULW\ &RPPHUFLDO 3DSHU RXWVWDQGLQJ.

Related to KDV 500

  • Infrastructure Charge means a Water Infrastructure Charge or a Sewerage Infrastructure Charge;

  • LCC-300 Cost Centre G : Terminus Building - E&M Works Pricing Schedule G4 : Plumbing and Drainage Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Pricing Schedule and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------ To Collection of Activity Xxxx G4 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • LCC-300 Cost Centre E Terminus Building - Structure Lump Sum Breakdown E4 : Station (GL X7-27/M-Q, 15.00m-21.96m) Lump Sum Item LSE4.4 E4.4 : Structural Steelwork Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ---------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSE4.4 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • high voltage means the classification of an electric component or circuit, if its working voltage is > 60 V and ≤ 1500 V DC or > 30 V and ≤ 1000 V AC root mean square (rms).

  • PV means photovoltaic.

  • CM means City Manager of COE appointed in terms of Section 82 of the Local Government: Municipal Structures Act 117 of 1998

  • MVAR means megavolt ampere of reactive power.

  • DT means the period of time in which the Participants have to apply for a certain number of Lots at a price to be chosen among those published by FluxSwiss.