Narrows II Powerhouse Full Flow Bypass definition

Narrows II Powerhouse Full Flow Bypass means the proposed action described in the Preliminary Biological Opinion for Yuba Project (FERC No. 2246) dated January 26, 2005.
Narrows II Powerhouse Full Flow Bypass means the action described in the NOAA Fisheries Biological Opinion for the Yuba Project (FERC No. 2246) dated November 4, 2005, at pages 5-7, and in FERC’s Order Modifying and Approving Amendment of License for the Yuba Project dated November 22, 2005, at pages 5-6.

Examples of Narrows II Powerhouse Full Flow Bypass in a sentence

  • During the parts of September of Schedule A Water Years when the Narrows II Powerhouse is shut down for normal maintenance and the Narrows II Powerhouse Full Flow Bypass is not available for operation, the Smartville Gage requirements will be 700 cfs or the full release capacity of the Narrows 1 Powerhouse at the Xxxxxxxxxxx Reservoir level that occurs at that time, whichever is less.

Related to Narrows II Powerhouse Full Flow Bypass

  • Maximum design heat input means the ability of a unit to combust a stated maximum amount of fuel per hour on a steady state basis, as determined by the physical design and physical characteristics of the unit.

  • Non-Administrator Skilled Nursing Facility means a Skilled Nursing Facility which does not have an agreement with the Claim Administrator or another Blue Cross and/or Blue Shield Plan but has been certified in accordance with guidelines established by Medicare.

  • CRR II means Regulation (EU) 2019/876 of the European Parliament and of the Council of 20 May 2019 amending Regulation (EU) No 575/2013 as regards the leverage ratio, the net stable funding ratio, requirements for own funds and eligible liabilities, counterparty credit risk, market risk, exposures to central counterparties, exposures to collective investment undertakings, large exposures, reporting and disclosure requirements, and Regulation (EU) No 648/2012.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Common Channel Signaling (CCS) means an out-of-band, packet-switched, signaling network used to transport supervision signals, control signals, and data messages. It is a special network, fully separate from the transmission path of the public switched network. Unless otherwise agreed by the Parties, the CCS protocol used by the Parties shall be SS7.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • General Special Servicer mean the Person performing the duties and obligations of special servicer with respect to the Mortgage Pool (exclusive of (A) any Serviced Loan Combination or related REO Property as to which a different Loan Combination Special Servicer has been appointed with respect thereto and (B) any Excluded Special Servicer Mortgage Loan or any related REO Property as to which an Excluded Mortgage Loan Special Servicer has been appointed with respect thereto).

  • Stinger-steered automobile or watercraft transporter means an automobile or watercraft transporter

  • Air dried coating means a coating that is dried by the use of air or forced warm air at temperatures up to 1940F (900C).

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Broad-Based Black Economic Empower-ment Act means the Broad-Based Black Economic Empowerment Act, 2003 (Act No. 53 of 2003);

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • Reliability Coordinator Area means that portion of the Bulk Electric System under the purview of the Reliability Coordinator.

  • Basecoat means a coat of colored material, usually opaque, that is applied before graining inks, glazing coats, or other opaque finishing materials and is usually topcoated for protection.

  • Other Special Servicer The applicable other “special servicer” under an Other Pooling and Servicing Agreement relating to a Serviced Companion Loan.

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Airline Designator Code means the two-characters or three letters, which identify particular air carriers.

  • high-efficiency cogeneration means cogeneration meeting the criteria laid down in Annex II;

  • Mistletoe Thinning means the removal of designated conifer trees bearing visible mistletoe plants on branches as well as visible plants or infections on the stem.

  • Asset Management Plan means a strategic document that states how a group of assets are to be managed over a period of time. The plan describes the characteristics and condition of infrastructure assets, the levels of service expected from them, planned actions to ensure the assets are providing the expected level of service, and financing strategies to implement the planned actions. The plan may use any appropriate format, as long as it includes the information and analysis required to be in a plan as described in Ontario’s Building Together: Guide for Asset Management Plans.

  • PJM Interconnection, L.L.C. or "PJM" means the privately-

  • Load Serving Entity or “LSE” shall have the meaning specified in the Reliability Assurance Agreement.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.