Lot depth means the horizontal distance between the front and rear lot lines.
Normal operation means all periods of operation except start-up and shutdown operations and maintenance of equipment;
Horizontal well means a well bore drilled laterally at an angle of at least eighty (80) degrees to the vertical or with a horizontal projection exceeding one hundred (100) feet measured from the initial point of penetration into the productive formation through the terminus of the lateral in the same common source of supply.
Normal Operating Conditions means those Service conditions which are within the control of Grantee. Those conditions which are not within the control of Grantee include, but are not limited to, natural disasters, civil disturbances, power outages, telephone network outages, and severe or unusual weather conditions. Those conditions which are ordinarily within the control of Grantee include, but are not limited to, special promotions, pay-per-view events, rate increases, regular peak or seasonal demand periods, and maintenance or upgrade of the Cable System.
Exploration Period means the period mentioned in Article 3 during which Exploration Operations may be carried out by the Contractor as provided in Article 3 hereof.
Exploration Well means a well that is not a development well, a service well or a stratigraphic test well.
Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.
Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.
Depth , in respect of a building, means the measured distance between the front line of the building and the back line of the rear main wall which separates the main building from the open space;
ILUA Area means the geographical area in relation to which the Framework ILUA applies, as specified in Schedule 2 of the Framework ILUA;
exploration area means that part of the Area allocated to the Contractor for exploration, described in schedule 1 hereto, as the same may be reduced from time to time in accordance with this contract and the Regulations;
Completion Rate means the percentage of an apprenticeship cohort who receives a certificate of apprenticeship completion within 1 year of the projected completion date. An apprenticeship cohort is the group of individual apprentices registered to a specific program during a 1 year time frame, except that a cohort does not include the apprentices whose apprenticeship agreement has been cancelled during the probationary period or who have transferred.
Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.
Operating pressure means the pressure at which the parts of an irrigation system are designed by the manufacturer to operate.
Working pressure means the settled pressure of a compressed gas at a reference temperature of 15 °C in a full pressure receptacle;
Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.
Excavation zone means the volume containing the tank system and backfill material bounded by the ground surface, walls, and floor of the pit and trenches into which the UST system is placed at the time of installation.
Normal weekly hours of work means the lesser of 40 hours or
Certificate of Final Completion means the certificate issued by A/E that documents, to the best of A/E’s knowledge and understanding, Contractor’s completion of all Contractor’s Punchlist items and pre-final Punchlist items, final cleanup and Contractor’s provision of Record Documents, operations and maintenance manuals, and all other closeout documents required by the Contract Documents.
Development Well means a well drilled inside the established limits of an oil or gas reservoir, or in close proximity to the edge of the reservoir, to the depth of a stratigraphic horizon known to be productive.
Normal Working Hours means 8 a.m. – 5 p.m., Monday – Friday, excluding PBI-observed U.S. holidays, in the time zone where the Equipment or other items are located.
Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;
Exploration Operations means operations conducted in the Contract Area pursuant to this Contract in searching for Petroleum and in the course of an Appraisal Programme and shall include but not be limited to aerial, geological, geophysical, geochemical, palaeontological, palynological, topographical and seismic surveys, analysis, studies and their interpretation, investigations relating to the subsurface geology including structural test drilling, stratigraphic test drilling, drilling of Exploration Xxxxx and Appraisal Xxxxx and other related activities such as surveying, drill site preparation and all work necessarily connected therewith that is conducted in connection with Petroleum exploration.
Final Completion Date means the date on which Final Completion occurs.
Test Well means a well constructed for the purpose of obtaining information needed to design a well prior to its construction. Test wells are cased and can be converted to observation or monitoring wells and under certain circumstances to production wells
Area C means areas of the West Bank outside Areas A and B, which, except for the issues that will be negotiated in the permanent status negotiations, will be gradually transferred to Palestinian jurisdiction in accordance with this Agreement.