Peche Island Shores – Phase II definition

Peche Island Shores – Phase II means the lands described in Schedule “D” hereto.

Examples of Peche Island Shores – Phase II in a sentence

  • Xxx.Xx. FAX No. Schedule A Peche Island Shores – Phase II This Schedule is attached to and forms part of the Agreement of Purchase and Sale between: BUYER, , and SELLER,....THE CORPORATION OF THE CITY OF WINDSOR.........................................

  • Xxx.Xx. FAX No. Schedule A1 Peche Island Shores – Phase II This Schedule is attached to and forms part of the Agreement of Purchase and Sale between: BUYER, , and SELLER,....THE CORPORATION OF THE CITY OF WINDSOR.........................................

  • Schedule J Peche Island Shores – Phase II ACKNOWLEDGMENT RE ZONING AMENDMENT The Purchaser acknowledges that The Corporation of the City of Windsor By-law Number 65-2018 is a by-law to amend Zoning By-law 8600.

Related to Peche Island Shores – Phase II

  • Capitol hill complex means the grounds and buildings within the area bounded by 300 North Street, Columbus Street, 500 North Street, and East Capitol Boulevard in Salt Lake City.

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Clean coal SNG facility means a facility that uses a

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Natural area means an area of the rural or non-urban environment which is in an unspoilt natural state or is of high scenic value, and includes, but is not limited to, national parks, game reserves, nature reserves, marine reserves, wilderness areas, areas of extensive agriculture and scenic areas;

  • Environmental Management Framework and “EMF” mean the framework of the Borrower for the management of social and environmental aspects of the Project dated April 24, 2007 and disclosed to the public on even date therewith, as may be amended from time to time with the prior approval of the Bank.

  • townsite in relation to the townsite to be established near the harbour means a townsite (whether or not constituted and defined under section 10 of the Land Act) primarily to facilitate the Company’s operations in and near the harbour and for employees of the Company and in relation to the mining areas means such a townsite or townsites or any other townsite or townsites which is or are established by the Company for the purposes of its operations and employees on or near the mining areas in lieu of a townsite constituted and defined under section 10 of the Land Act;

  • Virginia Stormwater Management Act means Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Design torso angle means the angle measures between a vertical line through the "R" point and the torso line in a position which corresponds to the design position of the seat-back established by the vehicle manufacturer;

  • Anchorage means the system by which the seat assembly is secured to the vehicle structure, including the affected parts of the vehicle structure;

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • cogeneration means the simultaneous generation in one process of thermal energy and electrical or mechanical energy;

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Summer Session means the time including all academic offerings during the pre-session, the regular four- week and eight-week sessions, and the post-session.

  • Project Management Agreement means the agreement dated the 20th February 1985 made between the Trustee and the Manager providing for the Manager to manage and co‑ordinate the development and construction of the Resort and includes, if that agreement is terminated, any other agreement in like and similar terms made with the prior consent of the Minister;

  • Environmental Management System means an environmental management system or plan of management to address all environmental risks and to ensure compliance with all Environmental Laws and licences;

  • Uppermost aquifer means the geologic formation nearest the natural ground surface that is an aquifer, as well as lower aquifers that are hydraulically interconnected with this aquifer within the facility's property boundary.

  • Stormwater management basin means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management basin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Appraisal management company means a person or entity that (i) administers a network of

  • Subordinate joint force commander means a sub-unified commander or joint task force commander.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Parallel Operation means the Generating Facility’s electrical apparatus is connected to the Transmission Provider’s system and the circuit breaker at the point of common coupling is closed. The Generating Facility may be producing electric energy or consuming electric energy at such time.

  • Green building strategies means those strategies that minimize the impact of development on the environment, and enhance the health, safety and well-being of residents by producing durable, low-maintenance, resource-efficient housing while making optimum use of existing infrastructure and community services.