Power augmentation definition

Power augmentation means technologies that increase the capacity and the heat rate of the plant above the capacity and heat rate of the base load gas plant. These include, but are not limited to, duct burning and some forms of steam augmentation.¶
Power augmentation means an increase in the gas turbine engine shaft output, or a decrease in turbine fuel consumption, by the addition of energy recovered from exhaust heat.
Power augmentation means the additional generation of Electricity at the Facility for sale to Third Parties as a result of the injection of low pressure steam and incremental Fuel into the Facility.

Examples of Power augmentation in a sentence

  • Power augmentation up to 14% has been recorded which is noteworthy in responding to the electricity demand in hot months.

  • EXPERIENCE: Human Resources Developer Specialist 13 - 15Four years of professional experience equivalent to a Human Resources Developer, including two years equivalent to a Human Resources Developer P11 or one year equivalent to a Human Resources Developer 12.KNOWLEDGE, SKILLS, AND ABILITIES: Extensive knowledge of adult learning theory methods.Extensive knowledge of training principles, practices, techniques and methods of evaluation.Knowledge of MDHHS policies and procedures.Knowledge of Walter P.

  • For above, necessary incentives from MNRE and State Government as applicable from time to time may be availed The targets set under this scheme is as follows S/NYearCapacity in MW12013-14222014-15532015-161042016-171552017-1820 7.B.2 Decentralized Distributed Generation for Electrification of Un-electrified Villages, Power augmentation in Electrified Villages etc.

  • Power augmentation can be duct firing, peak firing, water/steam injection, among other techniques, to increase output at the end of the offer curve.

  • Power augmentation to site: Scope additional power requirements.

  • Power augmentation is accomplished by injecting steam from the HRSG into the combustion turbine.

  • Power augmentation concepts using diffuser and shrouded brims around conventional wind turbines promise significant power coefficient increase.

  • Power augmentation is the injection of steam into the combustor, and is only used when combusting natural gas.

  • Diffusers (or shrouds) are aerodynamic structures, commonly employed for the purpose of Power augmentation of hydrokinetic turbines.

  • Power augmentation such as fogging, evaporative cooling, and steam injection may be used provided it meets all OEM requirements.


More Definitions of Power augmentation

Power augmentation means the additional generation of electricity at the Linden 6 Facility for sale to Third Parties as a result of the injection of steam into and the consumption of incremental fuel by the Linden 6 Facility.
Power augmentation means the generation of incremental Energy from one or more of the Combustion Turbines through the injection of steam from the Steam Turbine or the heat recovery steam generators into the combustor(s) of such Combustion Turbine(s).

Related to Power augmentation

  • Subsystem means any subset of the System identified as such in the Contract that may be supplied, installed, tested, and commissioned individually before Commissioning of the entire System.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Large Facility Interconnection Procedures or “LFIP”) shall mean the interconnection procedures applicable to an Interconnection Request pertaining to a Large Generating Facility that are included in Attachment X of the NYISO OATT. Standard Large Generator Interconnection Agreement (“LGIA”) shall mean this Agreement, the form of interconnection agreement applicable to an Interconnection Request pertaining to a Large Generating Facility, that is included in Attachment X of the NYISO OATT. System Deliverability Upgrades shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to Byways and Highways and Other Interfaces on the existing New York State Transmission System and Distribution System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard at the requested level of Capacity Resource Interconnection Service. System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, required to (1) protect the New York State Transmission System from faults or other electrical disturbances occurring at the Large Generating Facility and (2) protect the Large Generating Facility from faults or other electrical system disturbances occurring on the New York State Transmission System or on other delivery systems or other generating systems to which the New York State Transmission System is directly connected. System Upgrade Facilities shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff shall mean the NYISO Open Access Transmission Tariff (“OATT”), as filed with the Commission, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Developer is engaged in on-site test operations and commissioning of the Large Generating Facility prior to Commercial Operation.

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate