Preliminary Quality Management Plan definition

Preliminary Quality Management Plan means the plan submitted pursuant to Section5.1.4 of Exhibit B to the ITP.

Examples of Preliminary Quality Management Plan in a sentence

  • Preliminary Quality Management Plan (maximum 15 Technical Proposal Score points)‌ Objective: A plan that complies with Section 2.4 (Quality Management) of the Technical Provisions and will be used to meet the quality objectives with respect to design, fabrication, construction, operations and maintenance for the Project with a particular emphasis on the multi-asset, multi-site nature of the Project.

  • For the painting quality component of the Preliminary Quality Management Plan, include a description of the approach for integrating bridge painting with construction, documenting the control of materials, any testing, inspection and monitoring of painting activities for which the Technical Provisions require Design-Build Contractor QA/QC, including reporting procedures, methodologies, and corrective actions.

  • For the painting quality component of the Preliminary Quality Management Plan, include a description of the approach for integrating bridge painting with construction, documenting the control of materials, any testing, inspection and monitoring of painting activities for which the Technical Provisions require Design-Build Contractor QA/QC, including reportingprocedures, methodologies, and corrective actions.

  • The Preliminary Quality Management Plan shall describe Proposer’s understanding and approach to Professional Services quality management for the Project as well as methodology used to minimize quality issues and re-work on the Project.

  • LIFE SERVICES does not recommend, provide or refer single women for contraceptives.

  • Proposer shall submit a Project Development Plan which shall consist of the following components:  Technical Approach (Section 4.1) Project Delivery Approach (Section 4.2) Preliminary Quality Management Plan (Section 4.3)The submittal requirements for each component of the Project Development Plan are described in the following sections.

  • The Preliminary Quality Management Plan shall describe Proposer’s understanding and approach to construction quality management for the Project as well as processes used to minimize non-conformance issues during construction.

  • The Preliminary Quality Management Plan shall describe the Proposer’s quality approach to design, systems engineering, construction and integration for the Project.

  • The Preliminary Quality Management Plan section of the Technical Proposal shall describe Proposer’s approach to quality management during all stages of the Project, and shall include the elements set forth in this section.

  • Such analytical frameworks might, for example, draw on theories of multi-level governance (Putnam 1988; Scharpf 2002).

Related to Preliminary Quality Management Plan

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Quality Assurance Plan or “QAP” shall have the meaning set forth in Clause 11.2;

  • Pest Management Plan and “PMP” means the Recipient’s plan dated March 9, 2010, which: (i) addresses the concerns relating to the Project risks associated with potential increases in the use of pesticides for agricultural production, intensification and diversification and controlling disease vector populations arising from irrigation schemes; (ii) sets forth mitigation and monitoring measures to be taken during Project implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels; (iii) recommends institutional measures to strengthen national capacities to implement the mitigation and monitoring measures; and (iv) as part of the implementation arrangements, identifies national agencies and other partners that could play a vital role in the success of the Project.

  • Management Plan means a plan to manage the activities and protect the special value or values in an Antarctic Specially Protected Area or an Antarctic Specially Managed Area.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • High Quality Waters means all state waters, except:

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Quality Assurance Program means the overall quality program and associated activities including the Department’s Quality Assurance, Design-Builder Quality Control, the Contract’s quality requirements for design and construction to assure compliance with Department Specifications and procedures.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.

  • site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;

  • Multiphase professional services contract means a contract for the providing of professional

  • National Ambient Air Quality Standards or “NAAQS” means national ambient air quality standards that are promulgated pursuant to Section 109 of the Act, 42 U.S.C. § 7409.

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate

  • Commercial Development Plan means the written commercialization plan attached as Appendix E.

  • Non-Participating Certified Clinical Nurse Specialist means a Certified Clinical Nurse Specialist who does not have a written agreement with the Claim Administrator or another Blue Cross and/or Blue Shield Plan to provide services to you at the time services are rendered.

  • Participating Certified Clinical Nurse Specialist means a Certified Clinical Nurse Specialist who has a written agreement with the Claim Administrator or another Blue Cross and/or Blue Shield Plan to provide services to you at the time services are rendered.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Ambient air quality standard means an established concentration, exposure time, and frequency of occurrence of air contaminant(s) in the ambient air which shall not be exceeded.

  • Initial Development Plan has the meaning set forth in Section 3.2(b).

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Forest management plan means a written plan prepared and signed by a qualified forester that prescribes measures to optimize production, utilization, regeneration, and harvest of timber. The forest management plan shall include a schedule and timetables for the various silvicultural practices used on forestlands, which shall be a maximum of 20 years in length. A forest management plan shall include all of the following: