Recompletion or reworking definition

Recompletion or reworking means any operation that requires a change in the physical construction of a well after its initial completion to secure production when there has been none, or to restore production that has ceased, or to increase production. Such operations include, but are not limited to, any changes in the depths of perforations, method of lift, tubing depths, packer depths, restoring pressure integrity to casing or tubing, etc.

Related to Recompletion or reworking

  • Recompletion means the completion for production of an existing well bore in another formation from which the well has been previously completed.

  • Rework and “Reworking” means subjecting a Product to one or more processing steps that are different from the established Manufacturing Process.

  • Workover means operations on a producing well to restore or increase production.

  • drilling means the act of boring a hole to reach a proposed bottom hole location through which oil or gas may be produced if encountered in paying quantities, and includes redrilling, sidetracking, deepening, or other means necessary to reach the proposed bottom hole location, testing, logging, plugging, and other operations necessary and incidental to the actual boring of the hole;

  • refurbishment means repairing of used electrical and electronic equipment as listed in Schedule I for extending its working life for its originally intended use and selling the same in the market or returning to owner;

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Drill means a response to a planned, simulated event.

  • Injection well means a well into which fluids are injected. (See also “underground injection”.)

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Salvaging means the lawful and controlled removal of reusable materials from solid waste.

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Test Well means a well constructed for the purpose of obtaining information needed to design a well prior to its construction. Test wells are cased and can be converted to observation or monitoring wells and under certain circumstances to production wells

  • borehole means a hole sunk into the earth for the purpose of locating, abstracting or using subterranean water and includes a spring;

  • Postproduction means an activity related to the finishing or duplication of a medium described in Subsection 59-12-104(54)(a).

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

  • Repair means to restore to proper operating condition a tank, pipe, spill prevention equipment, overfill prevention equipment, corrosion protection equipment, release detection equipment or other UST system component that has caused a release of product from the UST system or has failed to function properly.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Tests on Completion means the tests which are specified in the Contract or agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Installation means that the System or a Subsystem as specified in the Contract is ready for Commissioning as provided in GCC Clause 26 (Installation).

  • Dismantle means to take apart or remove any component, device or piece of equipment that is bolted, screwed, or fastened by other means and that would not be dismantled by a homeowner in the course of normal household maintenance

  • Renovation means altering a facility or one or more facility components in any way, including the stripping or removal of RACM from a facility component. Operations in which load-supporting structural members are wrecked or taken out are demolitions.

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Cost Overrun means an obligation exceeding the maxi- mum capital expenditure authorized by an approval.