Related Work definition

Related Work means any additional building, carpentry, painting, plastering, plumbing or other work or other trades that the Customer requires, which are not to be carried out by the Company; “Services” means the services provided by the Company to the Customer as part of the Works, which may include without limitation the installation of Goods; “Services Delay Charge” means the services delay charge (if any) set out in the Statement of Work; “Services Interruption Event” means any interruption to a Works caused by; a Force Majeure Event, the Customer’s failure to carry out or perform any obligation required of it under this agreement which in the sole opinion of the Company does or may cause a delay in the Works and any other matter which in the reasonable opinion of the Company will cause an interruption or delay in the performance of the Works; “Statement of Work” means the details outlining the provision of the Works, which statement can be delivered verbally or in writing (including email) and may include (where applicable) an estimate or quotation (as specifically expressed as the case) of costs; “Variation” means a change in the Statement of Work including the specifications, scope, time of supply, price or scale of the Works and such variation shall form part of this agreement; “Workmanship” means a good and high quality and standard of delivery in connection with the Services performed; “Works” means the supply of Goods and the provision of Services to the Customer as per each Statement of Work;
Related Work means work that is performed near a confined space in direct support of work inside the confined space.
Related Work. Items: Contractor’s Submission Schedule. Schedule of Tests and Inspections. Project: Work at the Site carried out pursuant to one or more sets of Contract Documents. Activity: A discrete part of each Contract that can be identified for planning, scheduling, monitoring, and controlling the Project. Activities included in a CPM schedule consume time and resources. Critical Activity: An activity on the critical path that has no total float. Predecessor Activity: An activity that precedes another activity in the network. Successor Activity: An activity that follows another activity in the network. Bid Milestone Schedule: Interim milestones, included in the Contract Documents, which each Contractor utilizes to formulate their Baseline Schedule. Contractor’s Baseline Schedule: Initial schedule, prepared by each Contractor, to complete the Work of their Contract in accordance with the Contract duration and starting point to which schedule updates are compared. Project Schedule: Contemporaneous schedules, prepared by the Construction Manager, which combines and coordinates activity of each Contractor’s Baseline Schedule into one coordinated Project Schedule. CPM: Critical path method is a scheduling method used to plan and schedule construction projects where activities are arranged based on activity relationships creating a time scaled network diagram. PDM: Precedence diagram method follows the standard CPM calculations and allows for special logic relationships creating an interdependent relationship throughout the network.

Examples of Related Work in a sentence

  • Related Work Described Elsewhere: In addition to standards described in this Section, comply with all requirements for cleaning up as described in various other sections of these Specifications.

  • Related Work Described Elsewhere: Individual requirements for submittals are described in pertinent other Sections of these Specifications.

  • Appendix B A Copy of PG&E’s Agreement for Installation or Allocation of Special Facilities (Forms 79-255, 79-280, 79-702) or Agreements to Perform Any Tariff Related Work (62-4527), if applicable (Formed by the Parties).

  • Related Work Described Elsewhere: Make all submittals in strict accordance with the provisions of Sections 01300.

  • Except as otherwise provided in this rate schedule, or where lighting service is installed in conjunction with facilities installed under the provisions of Rules 15 or 16, standard form contract 62-4527, Agreement to Perform Tariff Schedule Related Work shall be used for installations, rearrangements or relocations.


More Definitions of Related Work

Related Work means work that is performed near a confined space in direct support of work inside the confined space. (“travail connexe”) O. Reg. 632/05, s. 1; O. Reg. 492/09, s. 1.
Related Work shall include, but not be limited to, field trips, after school activities, sports runs, in-service and authorized standby.
Related Work means any additional building, carpentry, painting, plastering, plumbing or other work or other trades that the Customer requires, which are not to be carried out by the Company; “Services” means the services provided by the Company to the Customer as part of the Works, which may include without limitation the installation of Goods; “Services Delay Charge” means the services delay charge (if any) set out in the Statement of Work; “Services
Related Work means work that is performed near a confined space in direct support of work inside the confined space. (“travail connexe”) O. Reg. 632/05, s. 1.
Related Work shall have the meaning set forth in Section 16.2(a).
Related Work. The following items are not included in this Section and are specified under the designated Sections:
Related Work means a patentable or unpatentable invention, discovery, content, software, data, or know-how created by at least one (1) inventor or author of the Licensed Rights that (i) is directly related to sleep or sleep-related conditions, (ii) has application within the Field, (iii) is the product of UVA research, (iv) is disclosed to UVA LVG within two (2) years of the Amended and Restated Effective Date and prior to any Change of Control, and (iv) is not otherwise obligated to any third party.