Restoration of connection definition

Restoration of connection. If either party has performed a Temporary Disconnection in respect of a Customer's ICP, the party that performed the Temporary Disconnection must take reasonable steps to arrange restoration of supply to the connection as soon as reasonably practicable and in any case: (a) no longer than 3 Working Days after conditions for reconnection have been satisfied; or (b) by any other date agreed with the Customer. Vacant Site Disconnections and Associated Reconnections
Restoration of connection. If either party has performed a Temporary Disconnection in respect of a Consumer's ICP, the party that performed the Temporary Disconnection will take reasonable steps to arrange restoration of supply to the connection as soon as reasonably practicable and no longer than 3 Working Days after conditions for reconnection have been satisfied. Vacant Site Disconnections and associated reconnections The Retailer may undertake a Vacant Site Disconnection of an ICP if: the Retailer is recorded as the retailer for the ICP in the Registry; the ICP has an “active” status in the Registry; and in respect of that ICP, no Consumer Contract exists with the Retailer, and will undertake a Vacant Site Disconnection of an ICP without delay if the above criteria apply and the ICP has been inactive for at least 30 Working Days.

Related to Restoration of connection

  • Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.

  • Restoration means the repair and restoration of the Property after a Casualty or Condemnation as nearly as possible to the condition the Property was in immediately prior to such Casualty or Condemnation, with such alterations as may be reasonably approved by Lender.

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Substitute Improvements means the substitute or additional improvements of the Issuer described in Article V hereof.

  • CONSTRUCTION EQUIPMENT means all appliances and equipment of whatsoever nature for the use in or for the execution, completion operation or maintenance of the work unless intended to form part of permanent work.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Capital Improvements mean the purchase, renovation, rehabilitation, or construction of permanent land, buildings, structures, equipment and furnishings used directly for or in the Project, and any goods or services for the Project that are purchased and capitalized under GAAP, including any organizational costs and research and development costs incurred in Illinois. Capitalized lease costs for land, buildings, structures or equipment shall be included in “Capital Improvements” only if the lease term, including any extensions or options to extend, equals or exceeds the term of this Agreement, and provided that such lease costs are valued at their present value using the corporate interest rate prevailing at the time the Company filed its Application with the Department.

  • Water Connection means the point where a water service line attaches to a water main, thereby allowing water to flow from the City’s water system to an individual customer.

  • Repairs means the repairs to be made to the Mortgaged Property, as described on the Repair Schedule of Work (Exhibit C) or as otherwise required by Lender in accordance with this Loan Agreement.

  • Area of shallow flooding means a designated AO or AH Zone on a community's Flood Insurance Rate Map (FIRM) with one percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate; and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • Building, structure, facility, or installation means all of the pollutant-emitting activities which belong to the same industrial grouping, are located on one or more contiguous or adjacent properties, and are under the control of the same person (or persons under common control) except the activities of any vessel. Pollutant-emitting activities shall be considered as part of the same industrial grouping if they belong to the same major group (i.e., which have the same two-digit code) as described in the Standard Industrial Classification Manual, 1972, as amended by the 1977 Supplement (U.S. Government Printing Office stock numbers 4101-0066 and 003-005-00176-0, respectively).

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Excavation means the mechanical removal of earth material.

  • Construction-in-Process means cash expenditures for land and improvements (including indirect costs internally allocated and development costs) determined in accordance with GAAP for all Properties that are under development or will commence development within twelve months from any date of determination.

  • Constructional Plant means all appliances or things whatever nature required in or about the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work or temporary housing, hutting, office, stores, etc.,

  • Repair means to restore to proper operating condition a tank, pipe, spill prevention equipment, overfill prevention equipment, corrosion protection equipment, release detection equipment or other UST system component that has caused a release of product from the UST system or has failed to function properly.

  • Construction and Demolition Debris means and includes:

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Capital Addition means, with respect to any Property, any renovation, repair or improvement to such Property, the cost of which constitutes a Capital Expenditure.

  • Reconstruction means the replacement of components of an existing facility to such an extent that:

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;