Running retest means after passing the test allowing the engine to start, the device shall require a second test within a randomly variable interval.
Running retest means that feature of the device that requires the driver to take additional BrAC tests after the initial test to start the vehicle.

Examples of Running retest in a sentence

  • Running retest failures or refusals result in horns blowing .The Swedish device certification requires breath tests with air temperature and humidity require- ments in a physiological range plus voice and/or inhalation requirements to assure valid tests.

  • ADDITIONAL PENALTY TIME WILL BE ASSIGNED AS FOLLOWS PER DOWNLOAD:1 Month ViolationsWarning - BrAC reading of .020 to .024 Fail - BrAC reading of .025 to .0492 Month ViolationsHigh Fail - BrAC reading of .050 or higher Three missed appointment charges Running retest violationsBreath alcohol content (BrAC) readings may be reported to the Safety and Treatment (S&T) facility where you are currently enrolled.

  • Running retest failures or refusals result in horns blowing.The Swedish device certification requires breath tests with air temperature and humidity require- ments in a physiological range plus voice and/or inhalation requirements to assure valid tests.

Related to Running retest

  • Running at Large means any dog while roaming, running or self-hunting off the property of its owner or custodian and not under its owner's or custodian's immediate control.

  • Daytime running lamp means a lamp facing in a forward direction used to make the vehicle more easily visible when driving during daytime.

  • Net metering period means the 12-month period following the date of final interconnection of the

  • Claim Determination Period means a calendar year. However, it does not include any part of a year during which a person has no coverage under This Plan, or any part of a year before the date this COB provision or a similar provision takes effect.

  • Final Completion Date means the date on which Final Completion occurs.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Scheduled Completion Date shall be the date set forth in Clause 10.3;

  • Modular building retailer means any person who purchases or acquires a modular building from a

  • Semi-annual (2/Year) sampling frequency means the sampling shall be done during the months of June and December, unless specifically identified otherwise.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Metering Date for a Billing Period, means the midnight of the last Day of the calendar month.

  • Commissioning Period has the meaning set forth in Attachment T.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Furniture maintenance product means a wax, polish, conditioner or any other product designed for the purpose of polishing, protecting or enhancing finished wood surfaces other than floors but does not include dusting aids, wood cleaners, products designed solely for the purpose of cleaning and products designed to leave a permanent finish such as stains, sanding sealers and lacquers.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.

  • Supply Start Date means the date(s) specified in clause 2.8;

  • Over-Riding Nomination Criteria means the criteria set out in clause 4.2.

  • Random selection basis means a mechanism for selection of employees that:

  • voltage ride through as used herein shall mean the ability of a Small Generating Facility to stay connected to and synchronized with the system or equipment of the Transmission Owner and any Affected Systems during system disturbances within a range of under-voltage and over-voltage conditions, in accordance with Good Utility Practice and consistent with any standards and guidelines that are applied to other generating facilities in the Balancing Authority Area on a comparable basis.

  • Semi-annual (2/Year) sampling frequency means the sampling shall be done during the months of June and December, unless specifically identified otherwise.

  • Net Metering Net metering refers to customers who sell electricity they produce, typically through a rooftop solar panel, back to the utility for credit. If you are a net metering customer, you should not enroll with XOOM because your net metering agreement will not transfer to XOOM once you enroll.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Milestone Payment Date has the meaning set forth in Section 2.4(a).

  • Delivery Year means the Planning Period for which a Capacity Resource is committed pursuant to the auction procedures specified in Tariff, Attachment DD, or pursuant to an FRR Capacity Plan under Reliability Assurance Agreement, Schedule 8.