Site Mobilization definition

Site Mobilization means December 31, 1994.
Site Mobilization has same meaning as set forth in the Lease.
Site Mobilization means the date on which Contractor commences and continues construction on the Job Site.

Examples of Site Mobilization in a sentence

  • During the performance of the Work from the Initial Site Mobilization and thereafter, Contractor shall maintain continuously at the Job Site adequate management, supervisory, administrative, security and technical personnel, including the Contractor Site Manager, to ensure expeditious and competent handling of all matters related to the Work, according to its determination of the staffing required for this purpose.

  • Upon the Initial Site Mobilization by Contractor and continuing through the Mechanical Completion Date, Owner shall obtain and maintain in force an All Risk Installation and Builder's Risk Insurance policy (the “Builder’s Risk Policy”) including Delay in Start-Up coverage.

  • During the performance of the Work from the Initial Site Mobilization and thereafter, Contractor shall maintain a suitable office at the Job Site at or near the site of the Work which shall be the headquarters of Contractor’s Representative designated pursuant to Section 3.12.

  • Prior to the Initial Site Mobilization by Contractor and continuing through the Final Acceptance Date, Owner shall obtain and maintain in force an “All Risk” Installation and Builder’s Risk Insurance Policy (the “Builder’s Risk Policy”) in an amount at least equal to the full replacement value of the Facility.

  • In addition to the CSI cost breakdown listing, the following additional cost breakdowns are required: Bond & Insurance Site Mobilization General Conditions Scheduling and Coordination of work Field Supervision Punchlist Project Closeout Items All costs shall indicate the labor and material cost associated with each items noted on the cost breakdown.

  • A certificate of insurance evidencing the Builder’s Risk Insurance coverage shall be furnished to Contractor prior to Initial Site Mobilization by Contractor; provided that Contractor and Owner may agree to such other insurance coverage as they may mutually deem appropriate with respect to earthwork and other site preparation.

  • Refunded Bonds The term “Refunded Bonds” means, collectively, the [Refunded 2009A Bonds, the Refunded 2009B Bonds and the Refunded 2010A Bonds].Refunded 2009A Bonds The term “Refunded 2009A Bonds” means the Authority’s Senior Sewer Revenue Bonds, Series 2009A (Payable Solely From Installment Payment Secured By Wastewater System Net Revenues) described in Exhibit C attached hereto, to be refunded with a portion of the proceeds of the 20[ ] Bonds.

  • Site Mobilization shall be in accordance with the supplementary specification for Site Mobilization.

  • During the performance of the Work from the Initial Site Mobilization through Substantial Completion, Contractor shall maintain continuously at the Job Site adequate management, supervisory, administrative, security and technical personnel, including the Contractor Site Manager, to ensure expeditious and competent handling of all matters related to the Work, according to its determination of the staffing required for this purpose.

  • During the performance of the Work from the Initial Site Mobilization and thereafter, Contractor shall maintain continuously at the Job Site adequate management, supervisory, administrative, security and technical personnel, to ensure expeditious and competent handling of all matters related to the Work, according to its determination of the staffing required for this purpose.


More Definitions of Site Mobilization

Site Mobilization means the submission by CEPA of its certificate confirming the commencement of site preparation activities constituted by the provision at the Site of a site notice board identifying the name of the Project, its proponents, and the principal consultants and contractors and a "portcabin" type site office, the arrival at the Site of heavy equipment for the initial site clearance and levelling activities and the initiation of ground levelling and grading works at the Site;

Related to Site Mobilization

  • Mobilization means establishment of sufficiently adequate infrastructure by the CONTRACTOR at "SITE" comprising of construction equipments, aids, tools tackles including setting of site offices with facilities such as power, water, communication etc. establishing manpower organisation comprising of Resident Engineers, Supervising personnel and an adequate strength of skilled, semi-skilled and un-skilled workers, who with the so established infrastructure shall be in a position to commence execution of work at site(s), in accordance with the agreed Time Schedule of Completion of Work. "MOBILISATION" shall be considered to have been achieved, if the CONTRACTOR is able to establish infrastructure as per Time Schedule, where so warranted in accordance with agreed schedule of work implementation to the satisfaction of ENGINEER-IN-CHARGE/ EMPLOYER.

  • Demobilization means removal of all equipment, machinery, manpower from the site after completion of the services with the due permission of EIC.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Construction Contractor means a person who undertakes to or offers to undertake to, or purports to have the capacity to undertake to, or submits a bid to, or does himself or by or through others, construct, alter, repair, add to, subtract from, improve, move, wreck, or demolish any building, highway, road, railroad, excavation, or other structure, project, development, or improvement to real property, or to do any part thereof. "Construction contractor" includes subcontractors, specialty contractors, prime contractors, and any person receiving consideration for the general supervision and/or coordination of such a construction project except for remediation contracting. This definition shall govern without regard to whether or not the construction contractor is acting in fulfillment of a contract.

  • EPC Contractor means the contractor responsible for engineering, procurement and construction of the Facility, including Seller if acting as contractor, and including all subcontractors.

  • Stormwater management system means any equipment, plants,

  • Facility Site means the site described in Schedule B. “FERC” means the Federal Energy Regulatory Commission.

  • Pollution control facilities means water and air pollution control equipment and solid waste disposal facilities or any of them.

  • Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.

  • Utilization management section means “you or your authorized representative.” Your representative will also receive all notices and benefit determinations.

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Air navigation facility means any facility, other than one owned and operated by the United States, used in, available for use in, or designed for use in aid of air navigation, including any structures, mechanisms, lights, beacons, markers, communicating systems, or other instrumentalities or devices used or useful as an aid, or constituting an advantage or convenience to the safe taking off, navigation, and landing of aircraft, or the safe and efficient operation or maintenance of an airport, and any combination of any or all of such facilities.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Site Visit means a visit to the Site; and

  • Project Work means the work required to complete the Project.

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Crisis stabilization means a service lasting less than 24 hours (23.59 hours), to or on behalf of a beneficiary for a condition that required more timely response than a regularly scheduled visit. Service activities include but are not limited to one or more of the following: Assessment, collateral, and therapy. Crisis Stabilization is distinguished from crisis intervention by being delivered by providers who meet the Crisis Stabilization contract, site, and staffing requirements described in Sections 1840.338 and 1840.348 of CCR, Title 9.

  • Wastewater Facilities means the structures, equipment, and processes required to collect, carry away, and treat domestic and industrial wastes and dispose of the effluent.

  • Construction management contract means a contract in which a party is retained by the owner to

  • Project Management The individuals appointed by each Party cf. clause 4.1 in the Agreement.

  • Construction Services means either of the following for construction-manager-at-risk, design-build and job-order-contracting project delivery methods: