Special management area use permit definition

Special management area use permit means an action by the authority authorizing development, the valuation of which exceeds $65,000 or which may have a substantial adverse environmental or ecological effect, taking into account potential cumulative effects.
Special management area use permit means an action by the Commission authorizing development, the valuation of which exceeds $500,000 or which may have a cumulative impact, or a substantial adverse environmental or ecological effect on the Special Management Area.
Special management area use permit means an action by the authority authorizing development, the valuation of which exceeds

Related to Special management area use permit

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Environmental Management System means an environmental management system or plan of management to address all environmental risks and to ensure compliance with all Environmental Laws and licences;

  • Environmental and Social Management Plan or “ESMP” means a site-specific environmental and social management plan to be prepared in accordance with the parameters laid down in the ESMF and acceptable to the Association, setting forth a set of mitigation, monitoring, and institutional measures to be taken during the implementation and operation of the Project activities to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels, and including the actions needed to implement these measures.

  • Stormwater management system means any equipment, plants,

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Environmental Management Framework and “EMF” mean the framework of the Borrower for the management of social and environmental aspects of the Project dated April 24, 2007 and disclosed to the public on even date therewith, as may be amended from time to time with the prior approval of the Bank.

  • Environmental and Social Management Framework or “ESMF” means an instrument satisfactory to the Association, prepared and adopted by the Recipient and dated February 5, 2010 outlining the process for management of the environmental and social aspects of the Project as the same may be amended from time to time with the Association’s prior written concurrence.

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • Management Area means the land and waters to which this Act applies by operation of section 4, and includes any land the subject of an agreement under section 11(1)(a);

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Parking Permit means a permit issued by the Council to residents allowing the parking of a vehicle in a residents parking bay on the highway within the area of the Council but not including a disabled person’s “purple badge” issued pursuant to Section 21 of the Chronically Sick and Disabled Persons Act 1970

  • Remediation waste management site means a facility where an owner or operator is or will be treating, storing or disposing of hazardous remediation wastes. A remediation waste management site is not a facility that is subject to corrective action under § 264.101 of this regulation, but is subject to corrective action requirements if the site is located in such a facility.

  • Building Permit means a permit for the construction of one or more Units, issued by the City, or other public agency in the event the City no longer issues said permits for the construction of Units within CFD No. 11. For purposes of this definition, "Building Permits" shall not include permits for construction or installation of commercial/industrial structures, parking structures, retaining walls, and utility improvements not intended for human habitation.

  • rural areas means any area within the county located outside the

  • Property management system means the Contractor’s system or systems for managing and controlling Government property.

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Hazardous Waste Management Facility means, as defined in NCGS 130A, Article 9, a facility for the collection, storage, processing, treatment, recycling, recovery, or disposal of hazardous waste.

  • Safety Management System has the meaning given to it in the ISM Code.

  • Qualified airport authority means an airport authority

  • Natural area means an area of the rural or non-urban environment which is in an unspoilt natural state or is of high scenic value, and includes, but is not limited to, national parks, game reserves, nature reserves, marine reserves, wilderness areas, areas of extensive agriculture and scenic areas;

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.