Examples of Storm Water Detention in a sentence
Storm water detention will be required to limit peak drainage discharges to existing natural undeveloped conditions.
Storm water detention and/or retention should be integrated into the site and addressed as a site feature and amenity as opposed to merely an infrastructure necessity.
Storm water detention, detention pond, underground detention, storm water/detention easement.
Storm water detention or retention areas may occur in said buffer areas.
Storm water detention basin contours, volume calculations and a statement from the design engineer certifying that the stormwater management facilities meet or exceed the requirements of the approved design.Two digital copies of the record drawing and the final, recorded plat of subdivision (AutoCAD) shall be submitted along with six plotted or photo reproduced copies.
Storm water detention does not apply toward the replacement volume.
Storm water detention requirements for any new construction development, redevelopment, or land use change occurring within Isabella County will be determined according to the storm water discharge permit procedure.
Storm water detention areas shall not serve as a credit toward the required park site.
Storm water detention basins, when needed, shall be designed, constructed and maintained in accordance with the BCEDG.
Storm water detention structures, which include extended detention ponds,control the rate at which water drains after a storm event.