Examples of Storm Water Management Report in a sentence
A Storm Water Management Report and Storm Water Management Permit is required for this project.
Specifically, this development is required to submit a Storm Water Management Permit application, associated permit fee, Stormwater Management Plan, and Storm Water Management Report to City Engineering.
The Developer shall submit a detailed Storm Water Management Report and Plans to the satisfaction of the City Engineer which shows how storm water will be controlled and conveyed to the receiving water body.
Provide a final set of site construction plans and a Storm Water Management Report for this project.
The Storm Water Management Report shall identify the locations and quantities of storm water runoff entering and exiting the site for both pre- and post-developed conditions.
If a computer program is used for hydrologic and hydraulic analysis and design, including generating and routing hydrographs, the output from the program shall be summarized in the Storm Water Management Report, and the name and version of the program shall be indicated.
Requirements for a certified record survey and addendum to the Storm Water Management Report shall be the same for water quality facilities as for detention facilities in section 8.2.8.
Public Civil Plan submittals for an Oil and Gas Location shall include the Final Drainage Report, Storm Water Management Report, and an Inspection and Maintenance Plan as outlined at the civil pre‐ submittal meeting.
Civil Plan submittals for Oil and Gas Midstream Locations and Oil and Gas Midstream Facilities will be determined on a case by case basis at the civil plan pre‐submittal meeting and may include: Final Drainage Report, Storm Water Management Report, and an Inspection and Maintenance Plan.
Whenever a Storm Water Management Report indicates that an adverse impact from storm water runoff is expected to result from the development of a property, that project shall be required to provide storm water detention facilities.