Examples of Stormwater Treatment Facilities in a sentence
The property owners of all Stormwater Treatment Facilities, except for distributed Facilities serving individual residential lots, must submit a maintenance certification report to the City, at the minimum of one (1) year following initial certification, and subsequently every two (2) years thereafter, or as required by the Director.
Stormwater Treatment Facilities shall be constructed as early as feasible during the Development process.
Performance Surety Waiver for Single Lot Developments: If Stormwater Treatment Facilities only serve a single building lot and a building is being constructed, a performance surety may be waived by the Director provided all Stormwater Treatment Facilities are constructed and certified prior to issuance of a Certificate of Occupancy.
For certain types and locations of Stormwater Treatment Facilities, the Director may at his discretion require additional or parallel inspections by City staff.
When seasonal or environmental conditions cause a delay in constructing the Stormwater Treatment Facilities, the Director may approve issuing a Certificate of Occupancy provided a performance surety is posted in accordance with this Section.
It is recognized that Stormwater Treatment Facilities are intended to protect the health and quality of streams and riparian corridors, and thus should be implemented within development sites rather than within dedicated stream corridors.
The City will maintain the Stormwater Treatment Facilities using the below frequencies and standards of maintenance.
XX will submit $ in costs to the City for the City inspecting and maintaining the Stormwater Treatment Facilities prior to any inspections or maintenance activities.
Post Construction Stormwater Treatment Facilities (STFs) are required for this development.
Land development that meets the land disturbance criteria of this memorandum must address storm water runoff quality through the use of Stormwater Treatment Facilities (STFs).