Examples of Supplied Material in a sentence
Product or Products means products, goods, material, machinery, devices, equipment, and fixtures forming the Work or any part thereof, but does not include Construction Equipment and Owner Supplied Material.
For clarity, the Work does not include the supply of Owner Supplied Material.
Owner Supplied Material means the material and/or equipment identified or referenced in the Drawings, Specifications or elsewhere in the Agreement as supplied by the Owner for incorporation into the Project, which is to be installed, tested, commissioned and otherwise dealt with, as applicable, by the Contractor in accordance with the Agreement.
Title to Owner Supplied Material shall remain with the Owner at all times.
Government Supplied Material (GSM) is the property of the Government of Canada.
Suppliers accepting these Purchase Orders shall be identified in VACCO’s Quality System as Level 1 Suppliers.Suppliers shall have an internal process or procedure that addresses the requirements in VACCO’s document VI-QFD-004 provided on the VACCO website.Suppliers that have been reviewed for Level 1 with VACCO Supplied Material are identified in VACCO’s Quality System as “VACCO Supplied Material-Level 1.” VACCO shall supply material for Level 1 Purchase Orders with these suppliers.
The Certificate must include the manufacturer’s certification or complete traceability from the original authorized manufacturer for the product(s) shipped.Aerojet Rocketdyne Supplied Material: If Buyer supplied materials/parts were used in performance of Buyer’s purchase order, the Seller shall include reference to the Aerojet Rocketdyne Furnished Material Transmittal number or other traceability to Aerojet Rocketdyne’s acceptance provided on the C of C.
If a RAM is submitted to the PEO, the engineer shall approve the RAM, coding with an “8” – “Source Approved” and note the page number where it is listed in the Contract Documents as an Agency Supplied Material.
Subject to Condition 11 all PURCHASER Supplied Material required by the Purchase Order shall be supplied as detailed in the Purchase Order.
PharmaZell shall be responsible for all quality control analyses of Supplied Materials and all Supplied Material shall be released by PharmaZell, in each case in accordance with the terms of the Quality Agreement.