Examples of Treatment train in a sentence
The following must be covered:o Capacityo Volume of treatment tankso Buffer tank(s) volume(s)o Treatment train details Disposal Method:o Water quality objectiveso Maintenanceo Alarmso Technical drawings of system Surface IrrigationSubsurface IrrigationSubstrata Irrigation Disposal Area Size: m2 Evaporation ponds: require an engineer’s certification, certifying the evaporation ponds are capable of disposing the total wastewater volumes that is being fed into the ponds.
The following must be covered:o Capacityo Volume of treatment tankso Buffer tank(s) volume(s)o Treatment train details▪ Disposal Method:o Water quality objectiveso Maintenanceo Alarmso Technical drawings of system Surface IrrigationSubsurface IrrigationSubstrata Irrigation Disposal Area Size: m2 Evaporation ponds: require an engineer’s certification, certifying the evaporation ponds are capable of disposing the total wastewater volumes that is being fed into the ponds.
Otherwise, the proof is similar to the following and is therefore omitted.
A1 - Treatment train 1: Trickling filters sedimentation chemical disinfection removal of pharmaceuticals in enzyme bioreactors.
Treatment train unit processes consist of one grinder and bar screen in the headworks, one flow equalization basin, one primary clarifier, two activated sludge aeration basins, two secondary clarifiers, one chlorine contact chamber, tertiary filtration with an anthracite bed filter, and dechlorination prior to final discharge at Discharge Point No. 001.
The following must be covered:o Capacity o Volume of treatment tankso Buffer tank(s) volume(s)o Treatment train detailso Water quality objectives Disposal Method:o Maintenanceo Alarmso Technical drawings of system Surface IrrigationSubsurface IrrigationSubstrata Irrigation Disposal Area Size: m2 Evaporation ponds: require an engineer’s certification, certifying the evaporation ponds are capable of disposing the total wastewater volumes that is being fed into the ponds.
On-line GPT and pondOn-line GPT and wetlandOn-line GPT and pond/wetlandOn-line GPT, pond and wetlandOn-line GPT and pond, off-line wetlandFigure 2.2. Treatment train options The treatment arrangement best suited to these requirements is an on-line hybrid wetland and pond system.
Treatment train systems should be designed with maintenance considerations in mind.
When there is a choice, SPU prefers technology in the following order:• Bioretention (infiltrating or non-infiltrating)• Infiltration• Non-infiltrating BMPs using filtration technology• Settling• Traditional infrastructures (e.g., ponds, sand filters, vaults)• Proprietary water quality treatments• Treatment train when oil control is required, SPU prefers API vault treatment rather than coalescing plates Consult with Operations when choosing the appropriate BMP.
The following must be covered: Capacity Volume of treatment tanks Buffer tank(s) volume(s) Treatment train details Water quality objectives Maintenance Alarms Technical drawings of systemDisposal Method: Surface Irrigation Subsurface Irrigation Substrata Irrigation Disposal Area Size: m2 Evaporation ponds: require an engineer’s certification, certifying the evaporation ponds are capable of disposing the total wastewater volumes that is being fed into the ponds.