Turnkey Cost to Casing Point definition

Turnkey Cost to Casing Point means an amount paid Operator, by Participant, representing Participant’s total share of the cost to drill to total depth and test the Prospect Xxxxx.

Examples of Turnkey Cost to Casing Point in a sentence

  • Participants shall deliver to Operator Participant’s share of the Turnkey Cost to Casing Point for drilling of the first Prospect Well, and the first Program initiated from successful financing will be for the Ellenburger Prospect Well formation at approximately 8,300 foot depth, as provided for in this Agreement and listed as follows in this section II.

  • The Turnkey Cost to Casing Point, and beyond to full production status, paid by Participant to Operator, is in payment of Participant’s share of the costs to Drill and Complete each Prospect Well to casing point and thereafter to full production status.

  • The Turnkey Cost to Casing Point, and beyond to full production status, paid by Participant to Operator, is in payment of Participant’s share of the costs to Re Enter and Recomplete each Prospect Well to casing point and thereafter to full production status.

  • In addition, Participant shall deliver to Operator $0.00, which represents Participant’s share of the Turnkey Cost to Casing Point for drilling the Prospect Xxxxx as provided for in this Agreement.

  • As mentioned in the introduction the ultimate supporter of diverse cities is journalist and activist Jane Jacobs.

Related to Turnkey Cost to Casing Point

  • Metering Point means, for meters that do not use instrument transformers, the point at which the billing meter is connected. For meters that use instrument transformers, the point at which the instrument transformers are connected.

  • Exit Point means a border control post or any other place designated by a Member State where animals, falling within the scope of Regulation (EC) No 1/2005, leave the customs territory of the Union;

  • Measurement Point means the emission source for which continuous emission measurement systems (CEMS) are used for emission measurement, or the cross-section of a pipeline system for which the CO2 flow is determined using continuous measurement systems;

  • Attachment point means a point on the network at which network assets are connected to assets owned by another person.

  • LCC-300 Cost Centre E Terminus Building - Structure Lump Sum Breakdown E4 : Station (GL X7-27/M-Q, 15.00m-21.96m) Lump Sum Item LSE4.4 E4.4 : Structural Steelwork Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ---------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSE4.4 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Cost Estimate means the detailed projected expenditure, including material costs and overhead, equipment costs and overhead, labor costs and overhead, and all taxes associated with each major material and service component, required for a line extension. It shall also separately identify any incremental costs associated with providing premium services. The Company may, for the purpose of standardization, establish standard construction cost estimates, for basic or premium service plans, which shall not exceed, in any event, the average cost of constructing such line extensions in the area involved, in which case the term “cost estimate” as used in this section will be understood to mean the standard estimate thus established.

  • LCC-300 Cost Centre G : Terminus Building - E&M Works Pricing Schedule G4 : Plumbing and Drainage Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Pricing Schedule and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------ To Collection of Activity Xxxx G4 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Utility Costs means utility and home energy costs related to the occupancy of rental property (e.g. electricity, gas, water and sewer, trash removal, and energy costs (such as fuel oil)) that are separately-stated charges. Utility Costs do not include telecommunication services (e.g. telephone, cable, and internet services).